| Planning | Form: (02A ) 400544224 3/17/2014 | The nearest building unit is located 1,852’ away from this oil and gas location, therefore it is not within a Designated Setback Location and is exempt from 604.c. |
| Material Handling and Spill Prevention | Form: (02A ) 400544224 3/17/2014 | Kerr-McGee will create tertiary containment by construction of a berm or diversion dike, site grading, or other comparable measures sufficient to further protect the ditches located 235’ Northeast and 390’ North the proposed oil and gas location. |