Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
LOCATION436062Sharp
24-3-11HC
PDC ENERGY INC
69175
AC
9/21/2023
WATTENBERG
90750
ADAMS  001
SWSW 24 1S67W 6
436062View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A)
400524831
02/05/2014
Operator will submit, via a Form 4 Sundry Notice, information detailing the manufacturer of the Temporary Large Volume Tank (TLVT), the size and volume of the TLVT, and the anticipated timeframe the TLVT will be on the oil and gas location. This Form 4 Sundry Notice shall be submitted prior to the TLVT being brought onto the oil and gas location.
OGLAForm: (02A)
400524831
02/05/2014
TLVTs may only be utilized for the storage of freshwater. E&P wastes, including produced water, treated E&P wastes, and flowback from hydraulic fracturing operations, are not allowed.
OGLAForm: (02A)
400524831
02/05/2014
TLVTs shall be constructed and operated in accordance with a design certified and sealed by a Colorado Licensed Professional Engineer.
OGLAForm: (02A)
400524831
02/05/2014
Site preparation and TLVT installation oversight shall be provided by a Professional Engineer or their designated representatives. Construction and installation of the tank structure, liner and sub-grade shall meet or exceed the manufacturer specifications.
OGLAForm: (02A)
400524831
02/05/2014
COGCC Rules 604.a. and 605.a.(2,3,5,6,7, and 8), as applicable to tank setbacks at the time of installation shall apply to the siting of TLVTs.
OGLAForm: (02A)
400524831
02/05/2014
All TLVT liner seams shall be welded at the liner manufacturers facility; field welded liners shall not be used. Liners shall not be reused.
OGLAForm: (02A)
400524831
02/05/2014
Signs shall be posted on the TLVT to indicate contents are freshwater and that no E&P waste fluids are allowed. Location and additional signage shall conform to Rule 210.
OGLAForm: (02A)
400524831
02/05/2014
TLVTs shall be operated with a minimum of 1 foot freeboard.
OGLAForm: (02A)
400524831
02/05/2014
Operator shall be onsite and inspect for leaks during the initial filling of the TLVT. If leaks are observed, filling shall cease and the leaks be repaired and the integrity of the tank evaluated.
OGLAForm: (02A)
400524831
02/05/2014
Once in operation, the TLVT shall be inspected daily and any deficiencies repaired as soon as practicable.
OGLAForm: (02A)
400524831
02/05/2014
Access to the TLVT shall be limited to operational personnel.
OGLAForm: (02A)
400524831
02/05/2014
Operators employing TLVTs on their Oil & Gas Locations shall develop and comply with a written standard operating procedure.
OGLAForm: (02A)
400524831
02/05/2014
Operator shall develop a contingency plan for any TLVT leak or catastrophic failure of the tank integrity and resulting loss of fluid. The plan should include a notification process to the COGCC and local emergency authority (municipal, county or both) for any failure and resulting loss of fluid.
OGLAForm: (02A)
400524831
02/05/2014
Should a failure of TLVT integrity occur, operator shall notify COGCC upon discovery, report the incident to COGCC on a Form 22-Accident Report within 10 days, and shall conduct a root cause analysis and provide it to the COGCC on a Form 4-Sundry Notice within 30 days of the failure.
AgencyForm: (02A)
400929058
06/13/2016
Per Operator, updated the following BMPs: Fencing: The wellsite will be fenced. Leak Detection Plan - See Attached Document #1010071 Per Operator, changed: From: Control of Fire Hazards: Ward and its contractor’s employ best management practices during the drilling and production of its wells and facilities. They will comply with appropriate COGCC and any county rules concerning fire and safety. Ward will ensure that any flammable material will remain no less than 25 feet from the wellhead (s), tanks and separator(s). To: Control of Fire Hazards: Ward and its contractor’s employ best management practices during the drilling and production of its wells and facilities. They will comply with appropriate COGCC and any county rules concerning fire and safety. Ward will ensure that any material not in use that might consitute a fire hazard, will remain no less than 25 feet from the wellhead (s), tanks and separator(s).
OGLAForm: (02A)
400929058
06/29/2016
Operator shall shall submit an updated SUA with the current Facility Layout Drawing via Form 4 Sundry.
OGLAForm: (04)
403427293
09/02/2024
Due to proximity to BUs, operator will comply with Table 423-1 Maximum Permissible Noise Levels.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
PlanningForm: (02A )
400524831
2/8/2014
Guy Line Anchors: Per the SUA, Ward will remove all guy line anchors for drilling and completions within 30 days upon termination of oil and gas operations by Ward.
PlanningForm: (02A )
400524831
2/8/2014
Development from existing well pads: Development from existing well pads was not an option for this well. However, this well pad will be considered for future well locations.
PlanningForm: (02A )
400524831
2/8/2014
Site Specific Measures: Ward will maintain a Stormwater Management Plan with site specific measurements to assess erosion control.
PlanningForm: (02A )
400524831
2/8/2014
Multiwell Pads: In order to reduce surface disturbance, Ward is permitting this 2A for five (5) wells.
Traffic controlForm: (02A )
400524831
2/8/2014
Traffic Plan: A traffic plan will be done if required by Adams County.
Traffic controlForm: (02A )
400524831
2/8/2014
Access Roads: Ward will utilize Highway and County roads as well as the agreed upon access road to the surface location per the SUA. Any required county permits will be obtains prior to use.
General HousekeepingForm: (02A )
400524831
2/8/2014
Loadlines: All loadlines shall be bullplugged or capped.
General HousekeepingForm: (02A )
400524831
2/8/2014
Removal of Surface Trash: Per the SUA, Ward agrees that all trash, refuse pipe, equipment, liquids, chemicals of other materials that are not necessary for the continued operations of the wells will be removed and disposed of no later than 30 days after completion. No such items will be burned or buried on location.
General HousekeepingForm: (02A )
400524831
2/8/2014
Well Site Cleared: Per the SUA, Ward agrees that all trash, refuse pipe, equipment, liquids, chemicals of other materials that are not necessary for the continued operations of the wells will be removed and disposed of no later than 30 days after completion. No such items will be burned or buried on location.
Material Handling and Spill PreventionForm: (02A )
400524831
2/8/2014
Leak Detection Plan: To ensure protection for the surface during fracturing treatment, the location will be specifically constructed to contain any releases or spills. Secondary containment from any chemical spills or leaks will surround any trucks that carry, mix, or add chemicals to the flow stream as well as connections that could possibly leak fluid. Should any spill or release occur, every reasonable step will be taken to quickly remediate the area disturbed.
Material Handling and Spill PreventionForm: (02A )
400524831
2/8/2014
Control of Fire Hazards: Ward and its contractor’s employ best management practices during the drilling and production of its wells and facilities. They will comply with appropriate COGCC and any county rules concerning fire and safety. Ward will ensure that any flammable material will remain no less than 25 feet from the wellhead(s), tanks and separator(s).
Dust controlForm: (02A )
400524831
2/8/2014
Operator will comply with Rule 805.c and take all practicable measures to control fugitive dust caused by the operation, including but not limited to wetting the soil with fresh water via a truck with a spreader bar if deemed necessary.
ConstructionForm: (02A )
400524831
2/8/2014
Berm Construction: A containment berm will be constructed around the oil and water storage tanks. The berm will be inspected regularly and maintained in good condition.
ConstructionForm: (02A )
400524831
2/8/2014
Fencing: Per the SUA, during drilling operations the well sites and any pits shall be fenced off required by the Owner.
ConstructionForm: (02A )
400524831
2/8/2014
Visual Mitigation: Pursuant to Rule 804, the tank battery shall be painted in uniform, non-contrasting, non-reflective color tones with the colors matched to but slightly darker than the surrounding landscape. Additionally, because the location is within the Rule 604.a.(2) setback due to its proximity to the dealership to the south and east, the battery facilities will be fenced with a 6’ chain-link fence with lath, the color for which shall be sufficiently similar to the tank color. This fence shall serve to restrict access to the site by unauthorized persons and as visual mitigation of the facility components.
Noise mitigationForm: (02A )
400524831
2/8/2014
Noise: Ward had an ambient sound study conducted for this location. Per the results, no sound mitigation will be necessary as it is anticipated that the noise will fall below levels for Light Industry.
Drilling/Completion OperationsForm: (02A )
400524831
2/8/2014
Closed Loop System: Closed Loop System will be used for drilling and fluid management. No reserve pit will be used.
Drilling/Completion OperationsForm: (02A )
400524831
2/8/2014
Green Completions: Ward will comply with COGCC Rule 805b.(3)A and utilize Green Completion Methods.
Drilling/Completion OperationsForm: (02A )
400524831
2/8/2014
BOPE Testing: Upon initial rig-up and once every 30 days during drilling operations, pressure testing of the casing string and each component of the BOPE will be performed to 70% of working pressure or 70% of the internal yield of the casing, whichever is less.
Drilling/Completion OperationsForm: (02A )
400524831
2/8/2014
BOPE for well servicing operations: Adequate blowout prevention equipment will be used on any servicing operations associated with this well. Backup staving valves shall be required on well servicing operations during reverse circulation. Valves will be pressure tested before each well servicing operation using both low-pressure and high-pressure fluid.
Drilling/Completion OperationsForm: (02A )
400524831
2/8/2014
BOPE: Ward will utilize drilling rigs with a minumum of a double ram and annular preventer.
Drilling/Completion OperationsForm: (02A )
400524831
2/8/2014
Drill Stem Tests: Drill Stem Tests are not anticipated for this location.
Drilling/Completion OperationsForm: (02A )
400524831
2/8/2014
Tank specifications: Tanks shall be constructed and maintained in accordance with the National Fire Protection Association Code 30 (2008 version). All tanks will be visually inspected once a day for issues. Recorded inspections will be conducted once a month pursuant to 40 CFR §112.
Drilling/Completion OperationsForm: (02A )
400524831
2/8/2014
Pit Level Indicators: Pit Level Indicators will not be needed as no pits will be used on location.
Final ReclamationForm: (02A )
400524831
2/8/2014
Identification of Plugged and Abandoned Wells: Pursuant to Rule 319.a.(5)., once the well has been plugged and abandoned, Ward will identify the location of the wellbore with a permanent monument that will detail the well name and date of plugging.
12