LOCATION435948Sunset 4-65 21-22
1H
CRESTONE PEAK RESOURCES OPERATING LLC
10633
AC
1/1/2026
DJ HORIZONTAL NIOBRARA
16950
AURORA/ARAPAHOE  005
SESE 22 4S65W 6
435948View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A)
402289776
08/12/2020
Operator shall submit additional Location Pictures showing greater interior of the Location and individual facilities via Form 4 Sundry, within 45 days upon receipt of the Amended Form 2A.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Storm Water/Erosion ControlForm: (02A )
402289776
9/4/2020
Operator will install stormwater controls around the perimeter of the location prior to construction and include a ditch and berm system of controls. They will remain in place through final reclamation or until pad is stabilized. Operator will conduct weekly inpections of the stormwater controls.
Material Handling and Spill PreventionForm: (02A )
402289776
9/4/2020
Secondary Containment All facilities will be equipped with remote monitoring and remote shut down, which includes isolation at the well head. Engineered liner systems will be used in secondary steel containment systems for tank batteries. Pollution control containers (spill boxes) will be used on truck loading lines and placed within the limits of the secondary containment system. Automatic shutdown level devices will be installed on each tank with remote monitoring capabilities. Automatic shutdown level devices will be installed on all pressure vessels and liquid knockouts. Automatic shutdown pressure devices will be installed on flowlines from well heads to facilities with remote monitoring capabilities. Additionally, cathodic protection will be used on buried steel lines to mitigate corrosion. Automatic shutdown pressure devices will be installed on process vessels with remote monitoring capabilities.
Dust controlForm: (02A )
402289776
9/4/2020
Dust associated with Site activities and traffic on roads will be minimized throughout all phases such that there are no visible dust emissions from sites or roads to the maximum extent practicable given wind conditions. Numerous mitigation measures are in place to minimize dust emissions including (but not limited to): application of fresh water to roads and ground during earth moving activities, curtailment of work during windy conditions and re-establishment of vegetation on disturbed areas that are not graveled.
Noise mitigationForm: (02A )
402289776
9/4/2020
Operator will use noise mitigation during the drilling and completion phases for the Zukowski 17 1H well site. Based upon modeled receptor locations, the Zukowski 17 1H wellsite is predicted to comply with the A-weighted and C-weighted COGCC noise limits.
Emissions mitigationForm: (02A )
402289776
9/4/2020
Emissions Controls Combustors will be available at the Location during the entire production phase to eliminate fugitive emissions in the event of maintenance or emergency use. The device will be fired using natural gas and operate with a 98% or higher hydrocarbon destruction efficiency. The device will be designed and operated in a manner that will ensure no visible emissions during normal operation. Test separators and associated flow lines, sand traps and emission control systems shall be installed on-site to accommodate green completions techniques. When commercial quantities of salable quality gas are achieved at each well, the gas shall be immediately directed to a sales line or shut in and conserved. If a sales line is unavailable or other conditions prevent placing the gas into a sales line, Operator shall not produce the wells without an approved variance per Rule 805.b.(3)C.
Odor mitigationForm: (02A )
402289776
9/4/2020
Operator will mitigate odors by routing to closed loop systems to the maximum extent practicable. If Operator receives complaints from a Residential Building within 1,320 feet from the site, Operator will take measures to mitigate the odor within 24 hours, based on the specific circumstances.
Drilling/Completion OperationsForm: (02A )
402289776
9/4/2020
Lighting is only used during the Drilling and Completion Phases of operations. No permanent lighting will be installed. All lighting used will be situated so that is downcast and does not shine beyond the boundary of the oil and gas operations area.