| Planning | Form: (02A ) 400500931 1/18/2014 | The nearest building unit is located 1650’ away from this oil and gas location, therefore it is not within a Designated Setback Location and is exempt from 604.c. |
| Material Handling and Spill Prevention | Form: (02A ) 400500931 1/18/2014 | A geosynthetic liner will be laid under the tanks on this location and a metal containment will be constructed. Berms or other secondary containment devices will be constructed around crude oil, condensate, and produced water storage tanks and shall enclose an area sufficient to contain and provide secondary containment for 150% of the largest single tank. |