Planning | Form: (15 ) 400465671 1/2/2014 | The COGCC to be notified 48 hours prior to construction of the Fresh Water Storage Pit.
A Form 15 Pit Report will be submitted within 30 days of construction of the
Fresh Water Storage Pit. |
Pre-Construction | Form: (15 ) 400465671 1/2/2014 | Operator has designed the well pad with insloping and a storm water control ditch to
prevent storm water run-on/runoff and the release of fluids from the location.
See attached Construction Layout Drawing. |
Material Handling and Spill Prevention | Form: (15 ) 400465671 1/2/2014 | Operator will ensure 110 percent secondary constainment for any volume of fluids
contained at the wellsite during drilling and completion. Operator will implement best
management practices to contain any unintentional release of fluids. |
Material Handling and Spill Prevention | Form: (15 ) 400465671 1/2/2014 | Fresh water for the Fresh Water Storage Pit comes from water provider; water sources
permitted for consumable industrial use. Operator shall not allow any fluids to flow
back to the Fresh Water Storage Pit/Pond. Fresh Water Storage Pit shall contain fresh
water only and signage prohibiting the use of the pit for any fluid that does not come
from municipal, irrigation or surface water source. |
Drilling/Completion Operations | Form: (15 ) 400465671 1/2/2014 | The location will be fenced and fenced area will include the Fresh Water Storage Pit.
Portions of the access road will cross highly erodible soil. The road will be built to the
minimal width required and ditch vegetation will be established to prevent erosion.
Production equipment will be painted with consideration to environmental colors to
reduce visual contrast with the surronding environment. Gas engines will be equipped
with mufflers to reduce noise. The fresh water storage pit will be screened to reduce
visibility.
|