| Planning | Form: (02A ) 400480607 12/26/2013 | The nearest building unit is located 1,362’ away from facility, therefore it is not within a Designated Setback Location and is exempt from 604.c. |
| Construction | Form: (02A ) 400480607 12/26/2013 | Kerr McGee will create tertiary containment by construction of a berm or diversion dike, site grading, or other comparable measures, sufficient to further protect the unnamed pond located 310’ northeast of the oil and gas location. |