Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
LOCATION435083DIAMOND VALLEY EAST
PAD
DUNAMIS ENERGY OPERATING LLC
10848
AC
3/1/2025
LAPOUDRE
48125
WINDSOR/WELD  123
SWSW 23 6N67W 6
435083View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A)
400497923
11/15/2013
Operator must implement site-specific best management practices in accordance with good engineering practices, including, but not limited to, construction of a berm or diversion dike, site grading, or other comparable measures, sufficient to protect the irrigation ditches located 150 feet west and 550 feet east of the oil and gas location from a release of drilling, completion, produced fluids, and chemical products.
OGLAForm: (02A)
400497923
11/15/2013
"This oil and gas location is permitted for production and oil and gas operations associated with the onsite wells. Management of produced fluids or E&P Waste from off site is not permitted without submittal of an amended Form 2A first.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
PlanningForm: (02A )
400497923
11/21/2013
Multi-well Pads. It is a multi-well pad located in a manner which allows for resource extraction while maintaining the highest distances passible from the offsetting residential areas.
Traffic controlForm: (02A )
400497923
11/21/2013
Traffic Plan. Traffic plans will be reviewed with the Town of Windsor in order to minimize impact to streets and residents
Traffic controlForm: (02A )
400497923
11/21/2013
Access roads. The access road will be constructed to accommodate local emergency vehicles. This road will be maintained for access at all times
General HousekeepingForm: (02A )
400497923
11/21/2013
Fencing requirements. A permanent fencing plan will be reviewed by the surface owner, the applicant.
General HousekeepingForm: (02A )
400497923
11/21/2013
Removal of surface trash. All trash, debris and material not intrinsic to the operation of the oil and gas facility shall be removed and legally disposed of as applicable.
Material Handling and Spill PreventionForm: (02A )
400497923
11/21/2013
Leak Detection Plan. Pumper will visit the location daily and visually inspect all tanks and fittings for leaks. Additionally, monthly documented SPCCP inspections are conducted pursuant to 40 CFR §112.
Material Handling and Spill PreventionForm: (02A )
400497923
11/21/2013
Berm construction. Tank berms shall be constructed of steel rings with a synthetic or engineered liner and designed to contain 150% of the capacity of the largest tank. All berms will be visually checked periodically to ensure proper working condition.
Material Handling and Spill PreventionForm: (02A )
400497923
11/21/2013
Loadlines. All loadlines shall be bullplugged or capped.
Material Handling and Spill PreventionForm: (02A )
400497923
11/21/2013
Tank specifications. Tanks will be designed, constructed and maintained in accordance with NFPA Code 30. The tanks are visually inspected once a day for issues, and recorded inspections are conducted once a month.
Noise mitigationForm: (02A )
400497923
11/21/2013
Lighting abatement measures shall be implemented, including the installation lighting shield devices on all of the more conspicuous lights, low density sodium lighting where practicable; and rig shrouding is not believed necessary as this is an industrial area and the only building unit within 1,000' is owned by the operator,however, at its election the operator may install temporary engineering controls consisting of perimeter sound walls shall be used on the location during drilling and completion activities to provide noise relief. Permanent equipment on location shall be muffled to reduce noise, or shall be appropriately buffered.
Drilling/Completion OperationsForm: (02A )
400497923
11/21/2013
Closed Loop Drilling Systems – Pit Restrictions. Not applicable; a closed-loop system will be used for drilling.
Drilling/Completion OperationsForm: (02A )
400497923
11/21/2013
Green Completions – Emission Control Systems. Test separators and associated flow lines and sand traps shall be installed on-site to accommodate Green completions techniques pursuant to COGCC Rules. In the anticipated absence of a viable gas sales line, the flowback gas shall be thermally oxidized in an emissions control device (ECD), which will be installed and kept in operable condition for least the first 90-days of production pursuant to CDPHE rules. This ECD shall have an adequate capacity for 1.5 times the largest flowback within a 10 mile radius, will be flanged to route gas to other or permanent oxidizing equipment and shall be provided with the equipment needed to maintain combustion where non-combustible gases are present.
Drilling/Completion OperationsForm: (02A )
400497923
11/21/2013
Blowout preventer equipment (“BOPE”). A double ram and annular preventer will be used during drilling. At least the drilling company shall have a valid well blowout prevention certifications.
Drilling/Completion OperationsForm: (02A )
400497923
11/21/2013
BOPE for well servicing operations. Adequate BOP equipment shall be used. Stabbing valves shall be installed in the event of reverse circulation and shall be prior tested with low and high pressure fluid.
Drilling/Completion OperationsForm: (02A )
400497923
11/21/2013
Pit level indicators. Not applicable; a closed-loop system will be used and no pits shall be dug.
Drilling/Completion OperationsForm: (02A )
400497923
11/21/2013
Drill stem tests. Not applicable; no Drill Stem tests are planned.
Drilling/Completion OperationsForm: (02A )
400497923
11/21/2013
Control of fire hazards. All materials which are considered fire hazards shall be a minimum of 25’ from the wellhead tanks or separators. Electrical equipment shall comply with API RP 500 and will comply with the current national electrical code. An emergency response plan has been generated for this site, please see the attached “EMERGENCY RESPONSE AND FIRE PROTECTION PLAN: DIAMOND VALLEY EAST LOCATION”
Drilling/Completion OperationsForm: (02A )
400497923
11/21/2013
Guy line anchors. All guy line anchors shall be brightly marked pursuant to Rule 604.c(2)Q
Final ReclamationForm: (02A )
400497923
11/21/2013
Well site cleared. Within 90-day subsequent to the time of plugging and abandonment of the entire site, superfluous debris and equipment shall be removed from the site.
Final ReclamationForm: (02A )
400497923
11/21/2013
Identification of plugged and abandoned wells. P&A’d wells shall be inditified persuant to 319.a.(5).
Material Handling and Spill PreventionForm: (04 )
402202154
10/9/2019
Leak Detention Plan: Extraction will monitor production facilities weekly at a minimum to a maximum of daily to identify fluid leaks, including, but not limited to, visually inspecting all wellheads, tanks and fittings. Additionally, annual SPCC inspections will be conducted and documented. Annual flowline testing will also occur according to COGCC Rules 1101 and 1102. Inspection and record retention of flowline testing will be in accordance per COGCC regulation. All records will be made available to the COGCC upon request.