| OGLA | Form: (02A) 400403623 06/25/2013 | The tank battery shall be constructed using a liner. |
| OGLA | Form: (02A) 400403623 07/22/2013 | Post a sign near the entrance to the facility with 24 hr. emergency contact information during construction of the facility and for the first year of operation. |
| OGLA | Form: (02A) 400403623 07/22/2013 | Provide COGCC 48 hour notice via Form 42 prior to initiation of construction. |
| OGLA | Form: (02A) 400403623 08/14/2013 | The access road to Billings 22-18 shall be maintained at regular intervals and as necessary to prevent dust generation during routine visits from pumper trucks or other maintenance vehicles. |
| OGLA | Form: (02A) 400403623 08/14/2013 | The primary access roads to this production facility and the related multi-well pads shall be constructed with a “dust free” surface material and maintained in good condition. Dust free materials may include asphalt, recycled asphalt, or other similar materials that when properly installed and maintained limit the amount of fine particulate matter available for dust generation. |
| OGLA | Form: (02A) 400403623 08/14/2013 | Operator shall install and maintain effective vehicle tracking control during construction, drilling, and completion, (including multi-well pads) to prevent tracking dirt and/or mud onto County Line Road. |