LOCATION434014HEBRON CENTRAL FACILITY
434014
FULCRUM ENERGY OPERATING LLC
10805
AC
7/22/2022
NORTH PARK HORIZONTAL NIOBRARA
60120
JACKSON  057
SWNE 7 7N80W 6
434014View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A)
400450827
08/20/2013
GENERAL SITE COAs: Notify the COGCC 48 hours prior to start of compressor station pad construction and start of operations using Form 42 (the appropriate COGCC individuals will automatically be email notified. Operator must implement best management practices to contain any unintentional release of fluids, including any fluids conveyed via temporary surface pipelines or buried permanent pipelines. Operator must ensure secondary containment for any volume of fluids contained at facilities pad site during operations; including, but not limited to, construction of a berm or diversion dike, diversion/collection trenches within and/or outside of berms/dikes, site grading, or other comparable measures (i.e., best management practices (BMPs) associated with stormwater management) sufficiently protective of nearby surface water. Any berm constructed at the compressor pad location will be stabilized, inspected at regular intervals (at least every 14 days), and maintained in good condition. The surface soils and materials are fine-grained and moderately unconsolidated; therefore the facility pad shall be constructed as quickly as possible and appropriate BMPs need to be in place both during, after facility pad construction completion, as well as during all operations. Standard stormwater BMPs must be implemented at this location to insure compliance with CDPHE and COGCC requirements and to prevent any stormwater run-on and /or stormwater runoff. Berms or other containment devices shall be constructed to be sufficiently impervious (preferably corrugated steel with poly liner) to contain any spilled or released material around crude oil, condensate, and produced water storage tanks. All tanks and aboveground vessels containing fluids or chemicals used in the storage and transmission processes and operations must have secondary containment structures (which may include, but is not limited to, double-walled tanks). All secondary containment structures/areas must be lined. Operator must ensure 110 percent secondary containment for the largest structure containing fluids within each bermed area of the facility during operations. The construction and lining of the secondary containment structures/areas shall be supervised by a professional engineer or their agent. Additional containment shall be required where temporary or permanent pumps and other necessary equipment or chemicals are located. Operator will use adequately sized containment devices for all chemicals and/or hazardous materials stored or used on location and the facility shall comply with the operators SPCC Plan. Within 30 calendar days of conclusion of the initial grading and earthwork and facility equipment placement, operator shall submit as-built drawings, including plan view and cross-sections (with perpendicular axes), prepared and stamped by a Professional Land Surveyor or Professional Engineer; including the facility pad, location of all equipment and secondary containment, stormwater BMPs, and the access road. Strategically apply fugitive dust control measures, including enforcing established speed limits on private roads, to reduce fugitive dust and coating of vegetation and deposition in water sources. Surface water samples from the unnamed stream (one upgradient and one downgradient to the facility location) located to the south-southeast of the facility (if water is present), shall be collected prior to the facility use and every 12 months (until facility closure) to evaluate potential impacts from tank facility operations. At a minimum, the surface water samples will be analyze for the following parameters: major cations/anions (chloride, fluoride, sulfate, sodium); total dissolved solids (TDS); and BTEX/DRO.
OGLAForm: (02A)
400603712
07/18/2014
Notify the COGCC 48 hours prior to start of pad construction, rig mobilization, spud, pipeline testing, start of hydraulic stimulation operations, and start of flowback operations (if different than hydraulic stimulation operations) using Form 42 (the appropriate COGCC individuals will automatically be email notified, including the LGD for hydraulic stimulation operations).
OGLAForm: (02A)
400603712
09/15/2014
PREVIOUS FORM 2A#400450827, OGCC ID#434014, GENERAL SITE COAs: Notify the COGCC 48 hours prior to start of compressor station pad construction and start of operations using Form 42 (the appropriate COGCC individuals will automatically be email notified. Operator must implement best management practices to contain any unintentional release of fluids, including any fluids conveyed via temporary surface pipelines or buried permanent pipelines. Operator must ensure secondary containment for any volume of fluids contained at facilities pad site during operations; including, but not limited to, construction of a berm or diversion dike, diversion/collection trenches within and/or outside of berms/dikes, site grading, or other comparable measures (i.e., best management practices (BMPs) associated with stormwater management) sufficiently protective of nearby surface water. Any berm constructed at the compressor pad location will be stabilized, inspected at regular intervals (at least every 14 days), and maintained in good condition. The surface soils and materials are fine-grained and moderately unconsolidated; therefore the facility pad shall be constructed as quickly as possible and appropriate BMPs need to be in place both during, after facility pad construction completion, as well as during all operations. Standard stormwater BMPs must be implemented at this location to insure compliance with CDPHE and COGCC requirements and to prevent any stormwater run-on and /or stormwater runoff. Berms or other containment devices shall be constructed to be sufficiently impervious (preferably corrugated steel with poly liner) to contain any spilled or released material around crude oil, condensate, and produced water storage tanks. All tanks and aboveground vessels containing fluids or chemicals used in the storage and transmission processes and operations must have secondary containment structures (which may include, but is not limited to, double-walled tanks). All secondary containment structures/areas must be lined. Operator must ensure 110 percent secondary containment for the largest structure containing fluids within each bermed area of the facility during operations. The construction and lining of the secondary containment structures/areas shall be supervised by a professional engineer or their agent. Additional containment shall be required where temporary or permanent pumps and other necessary equipment or chemicals are located. Operator will use adequately sized containment devices for all chemicals and/or hazardous materials stored or used on location and the facility shall comply with the operators SPCC Plan. Within 30 calendar days of conclusion of the initial grading and earthwork and facility equipment placement, operator shall submit as-built drawings, including plan view and cross-sections (with perpendicular axes), prepared and stamped by a Professional Land Surveyor or Professional Engineer; including the facility pad, location of all equipment and secondary containment, stormwater BMPs, and the access road. Strategically apply fugitive dust control measures, including enforcing established speed limits on private roads, to reduce fugitive dust and coating of vegetation and deposition in water sources. Surface water samples from the unnamed stream (one upgradient and one downgradient to the facility location) located to the south-southeast of the facility (if water is present), shall be collected prior to the facility use and every 12 months (until facility closure) to evaluate potential impacts from tank facility operations. At a minimum, the surface water samples will be analyze for the following parameters: major cations/anions (chloride, fluoride, sulfate, sodium); total dissolved solids (TDS); and BTEX/DRO.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
WildlifeForm: (02A )
400450827
8/29/2013
1. Establish company guidelines to minimize wildlife mortality from vehicle collisions on roads. 2. Where oil and gas activities must occur within 4 miles of greater sage-grouse leks or within other mapped greater sage-grouse breeding or summer habitat, conduct these activities outside the period between March 1 and June 30. 3. Use hospital grade mufflers for compressors, pump jacks, or other motors necessary to run operations at the site. Mufflers will be pointed upward to dissipate potential vibration. 4. Consider the use of internal combustors for disposal of gasses instead of traditional flaring techniques. 5. Install and utilize bear-proof dumpsters and trash receptacles for all food-related trash on location, following COGCC Rule 1204 a-1.
Traffic controlForm: (02A )
400603712
9/23/2014
Access roads. The access road has been constructed to accommodate local emergency vehicles. This road will be maintained for access at all times.
Material Handling and Spill PreventionForm: (02A )
400603712
9/23/2014
Leak Detection Plan. Pumper will visit the location daily and visually inspect all tanks and fittings for leaks. Additionally, monthly documented SPCCP inspections are conducted pursuant to 40 CFR §112.
Material Handling and Spill PreventionForm: (02A )
400603712
9/23/2014
Berm construction. Tank berms shall be constructed of steel rings with a synthetic or engineered liner and designed to contain 150% of the capacity of the largest tank. All berms will be visually checked periodically to ensure proper working condition.
Material Handling and Spill PreventionForm: (02A )
400603712
9/23/2014
Load-lines. All load-lines shall be bull-plugged or capped.
Material Handling and Spill PreventionForm: (02A )
400603712
9/23/2014
Tank specifications. Tanks will be designed, constructed and maintained in accordance with NFPA Code 30. The tanks are visually inspected once a day for issues, and recorded inspections are conducted once a month.