LocationLocation IDRelated Facilities
LOCATION430972POWERS
30N-27HZ
KERR MCGEE OIL & GAS ONSHORE LP
47120
AC
4/1/2025
WATTENBERG
90750
WELD  123
SWSW 27 2N65W 6
430972View Related
 
COGIS - Conditions of Approval Results
No records to display.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
ConstructionForm: (02A )
400339928
11/30/2012
Due to the significant number of horizontal wells to be developed in close proximity to the town of Hudson (33 total) and the fact that several of these wells will be drilled at the same time, Anadarko will work with the Town of Hudson to ensure many of the issues brought up by the Town Manager are addressed in a manner agreeable to both Anadarko and the Town of Hudson.  This will include the following: 1.    Anadarko will perform a road impact study for all roads belonging to the Town of Hudson prior to operations and then a second road impact study subsequent to drilling and completion operations.  Anadarko will pay for all required fixes to ensure any damaged roads are brought back to their condition prior to our operations 2.    Anadarko will take appropriate steps to adequately protect valve boxes and manholes located along any of our access roads 3.    In conjunction with the Town of Hudson, Anadarko will develop a site specific traffic management plan that will address the following: (1) expected traffic and timing of such traffic, (2) how traffic in busy or sensitive intersections will be managed and mitigated, and (3) what truck traffic restrictions will be put in place, if any 4.    Anadarko will provide the Town of Hudson an emergency response plan prior to commencing operations