| Material Handling and Spill Prevention | Form: (02A ) 400297394 7/27/2012 | Kerr-McGee will create secondary containment by constructing an earthen berm between the PAD site and the Beebe Seep Canal, located approximately 250' W of the PAD site to further protect the surface water. |