Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
LOCATION429093Pathfinder
C 11-12 1
AUSCO PETROLEUM INC
10412
AC
12/1/2025
FLORENCE-CANON CITY
24600
FREMONT  043
NWNW 12 20S70W 6
429093View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A)
400274302
04/30/2012
Operator must implement site-specific best management practices in accordance with good engineering practices, including, but not limited to, construction of a berm or diversion dike, site grading, or other comparable measures, sufficient to protect intermittent stream located 230 feet east of the staked oil and gas location from a release of drilling, completion, produced fluids, and chemical products.
OGLAForm: (02A)
400274302
05/21/2012
Brass survey markers originally placed by the Colorado Division of Reclamation and Mine Safety shall be returned to their pre-construction positions (elevation excepted) by a surveyor licensed in the State of Colorado during interim reclamation. Maintenance of the markers shall be the requirement of the operator until completion of final reclamation.
OGLAForm: (02A)
400274302
05/21/2012
If underground mine working are exposed during construction of the location the operator shall contact the COGCC within 24-hours. Notification shall be sent to via form 42. Any underground workings exposed by the operator shall be closed at the operator’s expense and meet with the Colorado Division of Reclamation and Mine Safety closure criteria. If underground workings are encountered, operator is responsible to ensure that site stability and site safety can be maintained throughout oil and gas operations.
OGLAForm: (02A)
400274302
05/21/2012
Provide notice to COGCC 48-hours prior to commencement of construction activities via form 42.
OGLAForm: (02A)
400274302
05/21/2012
Provide notice to COGCC 48-hours prior to commencement of Hydraulic Fracturing activities via form 42.
OGLAForm: (04)
2130973
03/01/2018
This Form 4 is approved for record-keeping purposes only.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
WildlifeForm: (02A )
400274302
5/31/2012
COGCC Rule 1204 (a) (1) relating to operator installation and utilization of black bear dumpsters and receptacles for is certainly applicable in this area and we encourage operators to comply with this rule to avoid human-bear conflicts at their drill sites.
WildlifeForm: (02A )
400274302
5/31/2012
The wells are located in mapped elk winter range and our recommendation for these facilities is avoid new construction between December 1 and April 15th.
Noise mitigationForm: (04 )
402847100
2/11/2022
AusCo will comply with sound emission regulations as set forth in COGCC 400 Series Operating and Reporting 423. NOISE Regulations. Prior to project start up, AusCo will conduct an ambient noise survey and gather noise level measurements at distances of 350 feet and 1000 feet from the project site. Measurements will be taken on the north, east and west sides of the project area. Upon start up, additional noise survey measurements will be taken to determine the increase, if any, in operational noise from the site equipment. Should the operational noise levels be in violation of applicable COGCC standards, AusCo will implement mitigation measures to decrease noise to acceptable levels. The proposed electrical generation equipment will be housed in fully enclosed sound attenuated transport trailers, and be equipped with noise reduction exhaust systems that will reduce sound levels to reasonable minimums. The computers used in the process will be contained in smaller fully enclosed sound attenuated trailers, parked adjacent to the generator trailers. The computer trailers will not generate noise, as there are only computers housed in them. Cooling radiators and fans for the computers will be mounted under the computer trailers in excavated trenches, and by design and location, will generate a minimum of operational noise.
Drilling/Completion OperationsForm: (04 )
402847100
2/11/2022
AusCo does not plan to install permanent lighting at the site for the proposed project. Generator trailers and computer trailers will be equipped with internal lighting, with on/off capability. There will be lighting at the entry doors of all trailers to allow safe entry during dark hours. Exterior lighting on the trailers will be turned off when not in use. Routine maintenance and repairs will normally be scheduled for daylight hours. In the event of a dark hours repair, temporary lighting will be plugged into the trailers. The temporary lighting will be shielded, and diverted downward and inward to minimize light pollution.
Interim ReclamationForm: (04 )
402847100
2/11/2022
AusCo will comply with applicable soil protection regulations as set forth in COGCC 1002.b Soils Removal and Segregation. AusCo will separate and store the topsoil horizon, or the top six (6) inches, whichever is deeper, and mark or document stockpile locations to facilitate subsequent reclamation. The stockpile will be seeded and protected from erosion and disturbance.
General HousekeepingForm: (04 )
403803357
6/5/2024
Materials and fluids will be stored neat and orderly. Wastes will be temporarily stored in sealed containers and regulary collected and disposed of at offsite, suitable facilities. Prompt cleanup of spills will be required to minimize any commingling of waste materials with stormwater runoff. Routine maintenance will be limited to fueling and lubrication of equipment. Drip pans will be used during routine fueling and maintenance to contain spills or leaks. Any waste product from maintenance will be containerized and transported offsite for disposal or recycling. There will be no major equipment overhauls conducted onsite. Cleanup will consist of patrolling the roadways, access areas, and other work areas to pick up trash, scrap debris, other discarded materials, and any contaminated soil. These materials will be disposed of properly.`
Noise mitigationForm: (04 )
403803357
6/5/2024
AusCo will comply with sound emission regulations as set forth in COGCC 400 Series Operating and Reporting 423. NOISE Regulations. Prior to project start up, AusCo will conduct an ambient noise survey and gather noise level measurements at distances of 350 feet and 1000 feet from the project site. Measurements will be taken on the north, east and west sides of the project area. Upon start up, additional noise survey measurements will be taken to determine the increase, if any, in operational noise from the site equipment. Should the operational noise levels be in violation of applicable COGCC standards, AusCo will implement mitigation measures to decrease noise to acceptable levels. The proposed electrical generation equipment will be housed in fully enclosed sound attenuated transport trailers, and be equipped with noise reduction exhaust systems that will reduce sound levels to reasonable minimums. The computers used in the process will be contained in smaller fully enclosed sound attenuated trailers, parked adjacent to the generator trailers. The computer trailers will not generate noise, as there are only computers housed in them. Cooling radiators and fans for the computers will be mounted under the computer trailers in excavated trenches, and by design and location, will generate a minimum of operational noise.`
Drilling/Completion OperationsForm: (04 )
403803357
6/5/2024
AusCo does not plan to install permanent lighting at the site for the proposed project. Generator trailers and computer trailers will be equipped with internal lighting, with on/off capability. There will be lighting at the entry doors of all trailers to allow safe entry during dark hours. Exterior lighting on the trailers will be turned off when not in use. Routine maintenance and repairs will normally be scheduled for daylight hours. In the event of a dark hours repair, temporary lighting will be plugged into the trailers. The temporary lighting will be shielded, and diverted downward and inward to minimize light pollution.`
Interim ReclamationForm: (04 )
403803357
6/5/2024
AusCo will comply with applicable soil protection regulations as set forth in COGCC 1002.b Soils Removal and Segregation. AusCo will separate and store the topsoil horizon, or the top six (6) inches, whichever is deeper, and mark or document stockpile locations to facilitate subsequent reclamation. The stockpile will be seeded and protected from erosion and disturbance.`