COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A)
400254109
04/03/2012
SITE SPECIFIC COA: If the well is to be hydraulically stimulated/treated, then flowback and stimulation fluids must be sent to tanks, separators, or other containment/filtering equipment before the fluids can be placed into any pipeline or pit located on the well pad or into tanker trucks for offsite disposal. The flowback and stimulation fluid tanks, separators, or other containment/filtering equipment must be placed on the well pad in an area with additional downgradient perimeter berming. The area where flowback fluids will be stored/reused must be constructed to be sufficiently impervious to contain any spilled or released material.
OGLAForm: (02A)
400313505
09/18/2012
If the well is to be hydraulically stimulated/treated, then flowback and stimulation fluids must be sent to tanks, separators, or other containment/filtering equipment before the fluids can be placed into any pipeline or pit located on the well pad or into tanker trucks for offsite disposal. The flowback and stimulation fluid tanks, separators, or other containment/filtering equipment must be placed on the well pad in an area with additional downgradient perimeter berming. The area where flowback fluids will be stored/reused must be constructed to be sufficiently impervious to contain any spilled or released material.
OGLAForm: (02A)
400333650
11/13/2012
SITE SPECIFIC COA: A closed loop system must be implemented during drilling (which operator has indicated on the Form 2A); or, if a closed loop system drilling rig is not used/available, then an amended Form 2A will need to be submitted/approved to include a drilling pit, and a Form 15 Earthen Pit Permit will also need to be submitted/approved prior to construction of the pit (the drilling pit will be required to be lined, fenced, and netted). All cuttings generated during drilling with oil based muds or high chloride/TDS mud must be kept in containers, a lined/bermed portion of the well pad, or the lined drilling (if permitted and constructed) prior to offsite disposal. The moisture content of any drill cuttings in a cuttings pit, trench, or pile shall be as low as practicable to prevent accumulation of liquids greater than de minimis amounts.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
WildlifeForm: (02A )
400254109
4/13/2012
1) Construct the pad and drill the well outside of the period between December 1 and April 15 for elk. 2) Construct and or drill any subsequent wells outside the period between December 1 and April 15 for elk. 3) Conduct post-development well site visitations between the hours of 10:00am and 3:00pm and reduce well site visitations between December 1 and April 15; emergencies exempted. 4) Use hospital grade mufflers for compressors, pump jacks, or other motors necessary to run operations at the site. 5) Interim and final reclamation will match existing communities. 6) Include a weed management plan and implement the plan as part of reclamation. 7) As much as is practicable, build access road to the minimal width and improvement standards.
Storm Water/Erosion ControlForm: (02A )
400254109
4/13/2012
Stormwater Management Plans (SWMP) are in place to comply with both Colorado Department of Public Health and Environment (CDPHE) and Colorado Oil and Gas Conservation Commission (COGCC) stormwater discharge permits. The construction layout for Deal Gulch 1-16 details Best Management Practices (BMPs) to be installed during initial construction. Note that BMPs may be removed, altered, or replaced with changing conditions in the field and the SWMP will be updated accordingly. The BMPs prescribed for the initial construction phase include, but are not limited to: • Construction diversion ditch • Sediment reservoirs • Check dams • Level spreaders • Stabilized construction entrance • Slash • Sediment trap • Wattle • Terrace • Secondary containment berms • Detention ponds
Material Handling and Spill PreventionForm: (02A )
400254109
4/13/2012
Spill Prevention Control and Countermeasure Plans (SPCC) are in place to address material releases and to prescribe materials handling BMPs for the facility. "Good housekeeping" measures will be taken to ensure proper waste disposal.
General HousekeepingForm: (02A )
400254109
4/13/2012
Shell will follow the guidelines of the Moffat County Weed and Pest Management Department.
WildlifeForm: (02A )
400313505
9/21/2012
1. Construct the pad and drill the well outside of the period between December 1 and April 15 for elk. 2. Construct and or drill any subsequent wells outside the period between December 1 and April 15 for elk. 3. Conduct post-development well site visitations between the hours of 10:00am and 3:00pm and reduce well site visitations between December 1 and April 15; emergencies exempted. 4. Shell agrees to be in noise abatement compliance with COGCC Rule 802.c for the “Industrial” zone during construction, drilling, and completion of the well, and in compliance with the “Residential/Agricultural/Rural” zone during production operations. 5. Interim and final reclamation will match existing communities. 6. Include a weed management plan and implement the plan as part of reclamation. 7. As much as is practicable, build access road to the minimal width and improvement standards. 8. Install and utilize bear-proof dumpsters and trash receptacles for all food-related trash on location, following COGCC Rule 1204 a-1.
WildlifeForm: (02A )
400313505
9/21/2012
Previous Form 2A BMPs: 1) Construct the pad and drill the well outside of the period between December 1 and April 15 for elk. 2) Construct and or drill any subsequent wells outside the period between December 1 and April 15 for elk. 3) Conduct post-development well site visitations between the hours of 10:00am and 3:00pm and reduce well site visitations between December 1 and April 15; emergencies exempted. 4) Use hospital grade mufflers for compressors, pump jacks, or other motors necessary to run operations at the site. 5) Interim and final reclamation will match existing communities. 6) Include a weed management plan and implement the plan as part of reclamation. 7) As much as is practicable, build access road to the minimal width and improvement standards.
Storm Water/Erosion ControlForm: (02A )
400333650
11/26/2012
Storm Water managment plans(SWMP) are in place to comply with both Colorado Department of Public Health and Environment(CDPHE) and Colorado Oil and Gas Conservation Commission(COGCC) storm water discharge permits. The construction layout submitted with the original Form 2A for this location details Best Management Practices that were implemented during the initial construction. Note that BMP's may be removed, altered, or replaced with the changing conditions in the field and the SWMP will be updated accordingly. The BMP's prescribed for the initial constrution phase include, but are not limited to: -Construct diversion ditch -Sediment Reservoirs -Check dams -Level spreaders -Stabilized construction entrance -Slash -Sediment Traps -Wattles -Terrace -Secondary containment berms -Detention pond
WildlifeForm: (02A )
400333650
11/26/2012
1. Drill the well outside of the period between December 1 and April 15 for elk (Waived by CPW for 2012-2013 on 11-02-12). 2. Drill subsequent wells outside the period between Decemeber 1 and April 15 for elk (Waived by CPW for 2012-2013 on 11-02-12). 3. Conduct post-development well site visitations between the hours of 10am and 3pm and reduce well site visitations between the period of December 1 and April 15; emergencies exempted. 4. Shell agrees to be in noise abatement compliance with COGCC rule 802.c for the "Industrial" zone during construction, drilling , and completion operations, and in compliance with the "Residential/Agricultural/Rural" zone during production. 5. Interim and Final reclamation will match existing communities. 6. This will be a multi-well pad. Interim reclamation will commence once all proposed wells have been drilled and completed from this location. 7. A weed managment plan will be implemented as part of reclamation. 8. Bear-proof dumpsters and trash receptacles will be utilized for all food-related trash on location, following COGCC rule 1204 a-1. 9. Access road was built to the minimum width and improvment standards as much as practicable.
Material Handling and Spill PreventionForm: (02A )
400333650
11/26/2012
Spill Prevention Control and Countermeasure Plans(SPCC) are in place to address material releases and to prescribe materials handling BMP's for the facility. "Good housekeeping" measures will be taken to ensure proper waste disposal.