| Construction | Form: (02A ) 400230045 3/30/2012 | CHEVRON WILL EMPLOY DUST SUPPRESSION TECHNIQUES OF FRESHWATER |
| General Housekeeping | Form: (02A ) 400230045 3/30/2012 | ALL SITES SHALL BE MAINTAINED IN A SANITARY CONDITION AT ALL TIMES AND ALL WASTE MATERIALS SHALL BE DISPOSED OF PROMPTLY AT APPROPRIATE WASTE DISPOSAL SITES. |
| Material Handling and Spill Prevention | Form: (02A ) 400230045 3/30/2012 | ALL FLUIDS WILL BE STORED IN APPROPRIATE CONTAINERS AND IN SECONDARY CONTAINMENT SYSTEMS AT 110 PERCENT OF THE LARGEST VESSEL VOLUME |
| Construction | Form: (02A ) 400230045 3/30/2012 | ALL ROADS WILL BE CROWNED AND DITCHED ACCORDING TO BLM MANUAL SECTION 9113. |
| Storm Water/Erosion Control | Form: (02A ) 400230045 3/30/2012 | STORM WATER PLANS AND EROSION CONTROL METHODS WILL BE USED TO INSURE SITE STABILIZATION. |