| Traffic control | Form: (02A ) 400550334 7/21/2014 | Production facilities for these wells will be shared at the North Platte 24-34 location. The shared production facility will greatly reduce long-term traffic to this location. |
| Dust control | Form: (02A ) 400550334 7/21/2014 | During frac'ing operations, dust control socks will be placed on the mountain movers/sand masters and storage bins to control the spread of fugitive silica dust. A Sierra Frac Sand, LLC Total Dust Constrol System, or equivalent, will be implemented in order to control the release of fugitive dust from inspection hatches on top of the bulk storage movers, transfer belts, "T" or "V" belts leading to the blender hopper, and drop ponts throughout the activities of unloading, storing, transfer, or conveying of sand used in hydraulic fracturing operations. |
| Noise mitigation | Form: (02A ) 400550334 7/21/2014 | Prior to drilling, 32' high perimeter sound walls with a minimum rating of STC-25 will be installed along the north edge of location, N/2 of East edge of location, and N/2 of West edge of location to deflect drilling and stimulation activity related noise away from residences located 572' NE, 770' N, 778' NE, 813' NE, and 817' NE. |
| Odor mitigation | Form: (02A ) 400550334 7/21/2014 | Oil and gas facilities and equipment will be operated in such a manner that odors and dust do not constitute a nuisance or hazard to public welfare. If drilling mud is to sit stagnant for any lengthy period of time, biocides will be added to prevent the build-up of nuisance odors. |
| Drilling/Completion Operations | Form: (02A ) 400550334 7/21/2014 | To the extent practicable, site lighting will be directed downward and inward and shielded so as to avoid glare on CR 62 and CR 50, and on homes located to the North and Northeast of location. |