15N-32HZ
KERR MCGEE OIL & GAS ONSHORE LP
47120
AC
6/24/2022
WATTENBERG
90750
WELD  123
SWSE 29 3N65W 6
427771View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A)
401208882
04/11/2017
The Approved Form 2A permit will be posted at the location during construction, drilling, and completions operations.
OGLAForm: (02A)
401208882
04/11/2017
The Operator shall submit reference area photos during the 2017 growing season. Photos shall be submitted via a Form 4 Sundry no later than November 1, 2017.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
PlanningForm: (02A )
401208882
5/7/2017
604c.(2).E. Multi-Well Pads: In order to reduce surface impact, this application is for a 13-well pad (8 proposed, 5 existing).
PlanningForm: (02A )
401208882
5/7/2017
604c.(2).Q. Guy Line Anchors: Guy line anchors will not be used. Base Beams will be used to stabilize the rig and removed after drilling.
PlanningForm: (02A )
401208882
5/7/2017
604c.(2).R. Tank Specifications: A geosynthetic liner will be laid under the tanks on this location and a steel containment will be constructed. Storage tanks will be designed, constructed and maintained in accordance with National Fire Protection Association (NFPA) Code 30 (2008 version). KMG will maintain written records to verify proper design, construction and maintenance. All records will be available for inspection by the Director.
PlanningForm: (02A )
401208882
5/7/2017
604c.(2).R. Tank Specifications: Two 500 barrel skid-mounted frac tanks will be temporarily placed on-site for use of the pre-spud rig only. One tank will store water and the other will store water based mud.
PlanningForm: (02A )
401208882
5/7/2017
604c.(2).S. Access Roads: KMG will utilize a lease access road from WCR 28 for drilling, completions, and production operations, including maintenance equipment. The road will be properly constructed and maintained to accommodate for local emergency vehicle access.
PlanningForm: (02A )
401208882
5/7/2017
604c.(2).V. Development From Existing Well Pads: KMG will locate the 8 proposed horizontal wells on the existing well pad with location ID #427771to reduce the amount of surface disturbance associated with this project.
Community Outreach and NotificationForm: (02A )
401208882
5/7/2017
305.a.(2) A Notice of Intent to Conduct Operations was sent to each building unit owner within the Exception Zone or Buffer Zone Setback. Recipients did not contact KMG. As a part of planning this proposed location, Kerr-McGee held multi-disciplinary Surface Impact Planning Meetings regarding the impacts and mitigations associated with this proposed location. The toll-free hotline number and email for the Anadarko Colorado Response Line will be posted at the entrance to the lease access road for stakeholders during drilling and completion operations at this proposed location. Courtesy Notifications will be sent to impacted stakeholders prior to drilling operations and again prior to completions operations, providing contact information for the Anadarko Colorado Response Line and online resources.
Traffic controlForm: (02A )
401208882
5/7/2017
604c.(2).D. Traffic Plan: Prior to the commencement of operations, the operator will obtain access and ROW permits per Weld County Code and implement COAs or traffic control plans as required.
General HousekeepingForm: (02A )
401208882
5/7/2017
604c.(2).O. Loadlines: All loadlines shall be bullplugged or capped.
General HousekeepingForm: (02A )
401208882
5/7/2017
604c.(2).P. Removal of Surface Trash: A commercial size trash bin for removing debris will be located on site. This bin will be for use by all parties affiliated with the operation. Upon completion of operations, the commercial trash bin will be removed from the location and disposed of in an appropriate manner.
Storm Water/Erosion ControlForm: (02A )
401208882
5/7/2017
604c.(2).G. Berm Construction: Kerr-McGee will create tertiary containment by construction of a berm or diversion dike, site grading, or other comparable measures sufficient to further protect the water well located 370’ south of this proposed oil and gas location.
Storm Water/Erosion ControlForm: (02A )
401208882
5/7/2017
604c.(2).W. Site-Specific Measures: KMG maintains a Storm Water Management Plan that assesses erosion control for every KMG operated location. This location will be added to this plan once construction begins. This site will be inspected every fourteen (14) days during construction activities, every twenty-eight (28) days after construction is completed, and after any major weather event.
Material Handling and Spill PreventionForm: (02A )
401208882
5/7/2017
604c.(2).F. Leak Detection Plan: Automation technology will be utilized at this facility. This technology includes the use of fluid level monitoring for the tanks and produced water sumps, high-level shut offs, and electronic sensors to monitor the interstitial space of double-walled produced water sumps. All automation is monitored by Kerr-McGee’s Integrated Operations Center (IOC), which is manned 24 hours per day, 7 days per week.
Material Handling and Spill PreventionForm: (02A )
401208882
5/7/2017
604c.(2).N. Control of Fire Hazards: KMG and its contractors will employ best management practices during the drilling and production of its wells and facilities and will comply with appropriate COGCC rules concerning safety and fire. KMG will ensure that any material that might be deemed a fire hazard will remain no less than twenty-five (25) feet from the wellhead(s), tanks and separator(s).
Dust controlForm: (02A )
401208882
5/7/2017
805.c. Dust: Water will be placed on dirt access roads to mitigate dust as needed. If feasible, magnesium chloride will also be used as needed on access roads to further abate dust.
ConstructionForm: (02A )
401208882
5/7/2017
604c.(2).G. Berm Construction: A geosynthetic liner will be laid under the tanks on this location and a metal containment will be constructed. Berms or other secondary containment devices will be constructed around crude oil, condensate, and produced water storage tanks and shall enclose an area sufficient to contain and provide secondary containment for 150% of the largest single tank. Berms and other secondary containment devices shall be inspected at scheduled intervals and maintained in good condition
ConstructionForm: (02A )
401208882
5/7/2017
604c.(2).M. Fencing Requirements: The completed wellsites will be surrounded with a fence and gate with adequate lock to restrict access to authorized personnel only. KMG personnel will monitor the wellsites regularly upon completion of the wells. Authorized representatives and/or KMG personnel shall be on-site during drilling and completion operations.
Noise mitigationForm: (02A )
401208882
5/7/2017
604c.(2).A. Noise: Sound surveys have been conducted on each rig type and are utilized to anticipate any additional effective noise mitigation once a drilling rig is determined. At a minimum, and pending a safety review after construction of the location, sound mitigation barriers (straw bales) will be placed along the South side of the pad location to dampen noise and minimize impact to the nearby residences and to Weld County Road 28 during drilling and completions and the building units that are situated on a commercial/industrial parcel. Should technological advancements allow for better noise mitigation at the time of drilling and completion operations on this location, Kerr-McGee will re-evaluate the most effective method at that time.
Noise mitigationForm: (02A )
401208882
5/7/2017
A thorough sound review will be conducted prior to construction of this production facility and any additional mitigation measures deemed effective and necessary at that time will be incorporated into the design.
Final ReclamationForm: (02A )
401208882
5/7/2017
604c.(2).T. Well Site Cleared: The wellsite will be cleared of all non-essential equipment within ninety (90) days after all wells associated with the pad have been plugged and abandoned.
Final ReclamationForm: (02A )
401208882
5/7/2017
604c.(2).U. Identification of Plugged and Abandoned Wells: Pursuant to rule 319.a.(5)., once the well has been plugged and abandoned, KMG will identify the location of the wellbore with a permanent monument that will detail the well name and date of plugging.