LOCATION427175Zarlengo
14-4 Facility
BAYSWATER EXPLORATION & PRODUCTION LLC
10261
AC
9/14/2020
WATTENBERG
90750
ADAMS  001
SESW 4 1S67W 6
427175View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A)
400226842
12/28/2011
All producing facilities shall be adequately fenced to prevent access by unauthorized persons.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Site SpecificForm: (02A )
400226842
12/30/2011
Fence the well site after drilling to restrict public and wildlife access. Keep well site location, the road, and the pipeline easement free of noxious weeds, litter and debris. Spray for noxious weeds, and implement dust control, as needed. Operator will not permit the release or discharge of any toxic or hazardous chemicals or wastes on Owner’s Land. Construct and maintain gates where any roads used by operator, its employees, or contractors cross through fences on the leased premises.
Interim ReclamationForm: (02A )
400226842
12/30/2011
Utilize only such area around each producing well as is reasonably necessary. Restore the remainder of the well site location to its original condition within a reasonable time after the completion of operations. All reseeding shall be done with grasses consistent with the Rocky Mountain native mix or other grasses reasonably requested by surface owner and during planting period suggested by Owner.
PlanningForm: (02A )
400226842
12/30/2011
When feasible develop multiple well sites by using directional drilling to reduce cumulative impacts and adverse impacts on wildlife resources.
ConstructionForm: (02A )
400226842
12/30/2011
Remove only the minimum amount of vegetation necessary for the construction of roads and facilities. Conserve topsoil during excavation and reuse as cover on disturbed areas to facilitate regrowth of vegetation. No construction or routine maintenance activities will be performed during periods when the soil is too wet to adequately support construction equipment.
Drilling/Completion OperationsForm: (02A )
400226842
12/30/2011
When available and reasonable use a closed-loop drilling mud system to preclude the use of an earthen reserve pits when available.
Storm Water/Erosion ControlForm: (02A )
400226842
12/30/2011
Use water bars, and other measures to prevent erosion and non-source pollution. Implement and maintain BMPs to control stormwater runoff in a manner that minimizes erosion, transport of sediment offsite, and site degradation. Co-locate gas and water gathering lines whenever feasible, and mitigate any erosion problems that arise due to the construction of any pipeline(s).
Final ReclamationForm: (02A )
400226842
12/30/2011
All surface restoration shall be accomplished to the satisfaction of Owner. All reseeding shall be done with grasses consistent with the Rocky Mountain native mix or other grasses reasonably requested by surface owner and during planting period suggested by Owner. Final reclamation shall be completed to the reasonable satisfaction of the Owner as soon as practical after installation (weather permitting) and in accordance with regulatory agency standards (BLM/COGCC).