LOCATION426365Peterson Ridge
01-20H
FULCRUM ENERGY OPERATING LLC
10805
AC
10/1/2025
NORTH PARK HORIZONTAL NIOBRARA
60120
JACKSON  057
SWSE 20 8N80W 6
426365View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A)
400199733
08/29/2011
SITE SPECIFIC COAs: Location may be a sensitive area due to potentially shallow groundwater; therefore, either a closed loop system must be used (which operator has indicated on the Form 2A), or the drilling pit must be lined and constructed above the top of groundwater. Operator must ensure 110 percent secondary containment for any volume of fluids contained at well site during drilling and completion operations; including, but not limited to, construction of a berm or diversion dike, diversion/collection trenches within and/or outside of berms/dikes, site grading, or other comparable measures (i.e., best management practices (BMPs) associated with stormwater management) sufficiently protective of nearby surface water. Any berm constructed at the well pad location will be stabilized, inspected at regular intervals, and maintained in good condition. Operator must implement best management practices to contain any unintentional release of fluids, including any fluids conveyed via temporary surface pipelines or buried permanent pipelines. The moisture content of any drill cuttings in a cuttings pit, trench, or pile shall be as low as practicable to prevent accumulation of liquids greater than de minimis amounts. If fracing operations occur, flowback and stimulation fluids must be sent to tanks, separators, or other containment/filtering equipment before the fluids can be placed into any pipeline or pit located on the well pad or into tanker trucks for offsite disposal. The flowback and stimulation fluid tanks, separators, or other containment/filtering equipment must be placed on the well pad in an area with additional downgradient perimeter berming. The area where flowback fluids will be stored/reused must be constructed to be sufficiently impervious to contain any spilled or released material.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
WildlifeForm: (02A )
400199733
11/6/2011
EOG will use a closed loop system during drilling operations for all three locations. The closed loop system will include 1- cuttings pit, and 4-6 400-bbl tanks. If the well is a producing location, EOG will install mufflers on production equipment reducing noise levels in accordance with COGCC Rules and Regulations. In accordance with EOGs Safety Rules and Regulations all company employees must complete a Smith Driving System Training class. EOG company policies prohibit the use or carrying of firearms in company offices and in company vehicles. Interim reclamation will be completed after completion activities or as early as possible to take advantage or available ground moisture. EOG will use a seed mix approved by the authorized officer for all reclamation activities. EOG agrees to conduct drilling and completion activities in accordance with COAs as established by Bureau of Land Management on Indian Creek 1-05H and Peterson Ridge 1-20H.