Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
LOCATION425332Napali
4
WIEPKING-FULLERTON ENERGY LLC
96340
AC
7/1/2020
GREAT PLAINS
32756
LINCOLN  073
NESW 17 10S55W 6
425332View Related
 
COGIS - Conditions of Approval Results
No records to display.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Storm Water/Erosion ControlForm: (02A )
400193405
9/12/2011
BMP Plan Wiepking-Fullerton Energy, L.L.C. 4600 S. Downing St. Englewood, CO 80113 303-789-1798 303-761-9067 (fax) Certification to Discharge Under CDPS General Permit COR-03000 Stormwater Discharges Associated with Construction Certification Number COR 39788 Napali # 4 well T10S, R55W Sec. 17: NE1/4SW1/4 Lincoln County, Colorado Description of Well Site and Construction Area 1-3 acre site with access road for drilling of oil and gas well. Terrain is flat with native grass and sagebrush. No receiving waters will be affected by well pad. Silt fences will be installed on low side site of drill site. Drilling pits closed and reclaimed with the drillsite. Topsoil will be separated and spread on drill site as final operation before reseeding operations which will be completed within 6 months weather permitting. To prevent soil erosion site will be disked and straw crimped in or manure spread. Stormwater Management Plan (SWMP) is on file in Wiepking-Fullerton Energy, L.L.C. office. Spill Prevention, Control and Countermeasure Plan is on file in Wiepking-Fullerton Energy, L.L.C. office.
ConstructionForm: (02A )
400193405
9/12/2011
Description of Well Site and Construction Area 1-3 acre site with access road for drilling of oil and gas well. Terrain is flat with native grass and sagebrush. No receiving waters will be affected by well pad. Silt fences will be installed on low side site of drill site. Drilling pits closed and reclaimed with the drillsite. Topsoil will be separated and spread on drill site as final operation before reseeding operations which will be completed within 6 months weather permitting. To prevent soil erosion site will be disked and straw crimped in or manure spread.
Material Handling and Spill PreventionForm: (02A )
400193405
9/12/2011
Spill Prevention, Control and Countermeasure Plan is on file in Wiepking­ Fullerton Energy, L.L.C. office.
Storm Water/Erosion ControlForm: (02A )
400193405
9/12/2011
Stormwater Management Plan (SWMP) is on file in Wiepking-Fullerton Energy, L.L.C. office.