| Material Handling and Spill Prevention | Form: (02A ) 400166641 6/30/2011 | There will be an access road on the north and an exit road to the south of the tank battery. KMG will build an eye brow earthen berm on the outside (north) of the access road on the north side of the battery to keep any liquids from reaching the canal. |