Planning | Form: (02A ) 401161269 3/3/2017 | This proposed oil and gas location is located in a rural rangeland area. The nearest building unit is located 1642’ away. |
Storm Water/Erosion Control | Form: (02A ) 401161269 3/3/2017 | 604c.(2).G. Berm Construction: Kerr-McGee will create tertiary containment by construction of a berm or diversion dike, site grading, or other comparable measures sufficient to further protect the ditch located 87' SW of this proposed oil and gas location. |