LOCATION423723Bringelson
33-21-9-58
VERDAD RESOURCES LLC
10651
AC
9/1/2024
DJ HORIZONTAL NIOBRARA
16950
WELD  123
NENW 33 9N58W 6
423723View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
Field OperationsForm: (04 )
401031839
6/23/2016
Equipment will be maintained in good condition and stored in workman like manner. Only equipment necessary for this location and included in the letter to the Director is covered by this variance.
Reclamation SpecialistForm: (04 )
400983390
2/10/2017
Carrizo requesting variance for five (5) years. Based on submission date, COGCC grants approval of 502.b variance up until 08/25/2021
Reclamation SpecialistForm: (04 )
400983390
2/10/2017
The private agreement embodied in the Surface Owner Waiver document attached to this Sundry does not modify or limit Carrizo’s responsibilities and obligations to comply with COGCC Rules and the Oil and Gas Conservation Act except for those Rules for which a Variance is explicitly granted here. Likewise, COGCC’s approval of this variance does not impair or modify any private agreements between Carrizo and the surface owners of these locations.
Reclamation SpecialistForm: (04 )
400983390
5/3/2017
COGCC’s approval of this variance request explicitly does not relieve Carrizo from compliance with COGCC’s “Notice to Operators: Procedures for Preset Conductors” (dated September 1, 2016 and revised October 6, 2016) where applicable.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Material Handling and Spill PreventionForm: (02A )
400169206
6/23/2011
Operator will ensure 110 percent secondary containment for any volume of fluids contained at the well site during drilling and completion. Operator will implement best management practices to contain any unintentional release of fluids.
Storm Water/Erosion ControlForm: (02A )
400169206
6/23/2011
Operator has designed the well pad with insloping and a storm water control ditch to prevent storm water run-on/runoff and the release of fluids from the location. See attached Construction Layout Drawing.
Site SpecificForm: (02A )
400169206
6/23/2011
Fresh water for the Fresh Water Storage Pit comes from water provider; water sources permitted for consumable industrial use.
Material Handling and Spill PreventionForm: (02A )
400169206
6/23/2011
Operator shall not allow any fluids to flow back to the Fresh Water Storage Pit.
Site SpecificForm: (02A )
400169206
6/23/2011
Fresh Water Storage Pit shall contain fresh water only and signage prohibiting the use of the pit for any fluid that does not come from municipal, irrigation or surface water source.
ConstructionForm: (02A )
400169206
6/23/2011
The location will be fenced and the fenced area will include the Fresh Water Storage Pit.
Pre-ConstructionForm: (02A )
400169206
6/23/2011
The COGCC to be notified 48 hours prior to construction of the Fresh Water Storage Pit.
Material Handling and Spill PreventionForm: (02A )
400222373
12/4/2011
Operator will ensure 110 percent secondary containment for any volume of fluids contained at the well site during drilling and completion. Operator will implement best management practices to contain any unintentional release of fluids.
Storm Water/Erosion ControlForm: (02A )
400222373
12/4/2011
Operator has designed the well pad with insloping and a storm water control ditch to prevent storm water run-on/runoff and the release of fluids from the location. See attached Construction Layout Drawing.
Site SpecificForm: (02A )
400222373
12/4/2011
Fresh water for the Fresh Water Storage Pit comes from water provider; water sources permitted for consumable industrial use.
Material Handling and Spill PreventionForm: (02A )
400222373
12/4/2011
Operator shall not allow any fluids to flow back to the Fresh Water Storage Pit/Pond.
Site SpecificForm: (02A )
400222373
12/4/2011
Fresh Water Storage Pit shall contain fresh water only and signage prohibiting the use of the pit for any fluid that does not come from municipal, irrigation or surface water source.
ConstructionForm: (02A )
400222373
12/4/2011
The location will be fenced and the fenced area will include the Fresh Water Storage Pit.
Pre-ConstructionForm: (02A )
400222373
12/4/2011
The COGCC to be notified 48 hours prior to construction of the Fresh Water Storage Pit.
PlanningForm: (02A )
400222373
12/4/2011
A Form 15 Pit Report will be submitted within 30 days of construction of the fresh water storage pit.
Material Handling and Spill PreventionForm: (02A )
400334330
11/30/2012
Operator will ensure 110 percent secondary containment for any volume of fluids contained at the well site during drilling and completion. Operator will implement best management practices to contain any unintentional release of fluids.
Storm Water/Erosion ControlForm: (02A )
400334330
11/30/2012
Operator has designed the well pad with insloping and a storm water control ditch to prevent storm water run-on/runoff and the release of fluids from the location. See attached Construction Layout Drawing.
Site SpecificForm: (02A )
400334330
11/30/2012
Fresh water for the Fresh Water Storage Pit comes from water provider; water sources permitted for consumable industrial use.
Material Handling and Spill PreventionForm: (02A )
400334330
11/30/2012
Operator shall not allow any fluids to flow back to the Fresh Water Storage Pit/Pond.
Site SpecificForm: (02A )
400334330
11/30/2012
Fresh Water Storage Pit shall contain fresh water only and signage prohibiting the use of the pit for any fluid that does not come from municipal, irrigation or surface water source.
ConstructionForm: (02A )
400334330
11/30/2012
The location will be fenced and the fenced area will include the Fresh Water Storage Pit.
Pre-ConstructionForm: (02A )
400334330
11/30/2012
The COGCC to be notified 48 hours prior to construction of the Fresh Water Storage Pit.
PlanningForm: (02A )
400334330
11/30/2012
A Form 15 Pit Report will be submitted within 30 days of construction of the fresh water storage pit.