OGLA | Form: (02A ) 400132362 2/16/2011 | The construction and lining of the pit shall be supervised by a professional engineer or their agent. XTO shall provide a Construction Report for the pit to the COGCC via Sundry within 60 days of pit construction. The Construction Report shall be certified by the supervising professional engineer. |
OGLA | Form: (02A ) 400132362 2/16/2011 | Due to the shallow soils and underlying fractured bed rock the following will apply: Location is in a sensitive area because of potential for adverse impacts to ground water/surface water; therefore all pits will be lined. |
OGLA | Form: (02A ) 400132362 2/16/2011 | Operator must implement site-specific best management practices in accordance with good engineering practices, including, but not limited to, construction of a berm or diversion dike, site grading, or other comparable measures, sufficient to prevent a release of drilling, completion, produced fluids, or chemical products from migrating off of the oil and gas location. |
OGLA | Form: (02A ) 400132362 2/16/2011 | The site specific stormwater/erosion control BMPs provided by XTO should be implemted immediately after pad construction. |
OGLA | Form: (02A ) 400132362 3/4/2011 | Notify the COGCC Oil and Gas Location Assessment (OGLA) specialist for South Eastern Colorado (Arthur Koepsell; email arthur.koepsell@state.co.us) 48 hours prior to initiating pad construction.
Notify the COGCC Oil and Gas Location Assessment (OGLA) specialist for South Eastern Colorado (Arthur Koepsell; email arthur.koepsell@state.co.us) 48 hours prior to spudding the well.
Notify the COGCC Oil and Gas Location Assessment (OGLA) specialist for South Eastern Colorado (Arthur Koepsell; email arthur.koepsell@state.co.us) 48 hours prior to commencing frac operations.
|