LOCATION421630Latham
41-4 Pad
BONANZA CREEK ENERGY OPERATING COMPANY LLC
8960
AC
2/1/2024
WATTENBERG
90750
WELD  123
NENE 4 4N63W 6
421630View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A)
400745622
03/03/2015
The proposed location is in a sensitive area with shallow groundwater and nearby surface water features. Tertiary containment shall be used along the down- and cross-gradient perimeters of the Location and shall be in place prior to commencing earthwork activities.
OGLAForm: (02A)
400745622
03/03/2015
Operator shall provide notice to COGCC 48 hours prior to commencing construction of this Oil and Gas Location via Form 42.
OGLAForm: (02A)
401594971
08/10/2018
Upon removal of the Production Facilities and closure of Location ID #421645, Operator shall submit a Form 27 in compliance with the 900-Series Rules.
OGLAForm: (02A)
401594971
08/10/2018
Upon removal of Production Facilities associated with Location ID #421645, Operator shall submit a Final Reclamation Plan and begin Final Reclamation in compliance with Rule 1004.
OGLAForm: (02A)
401594971
08/10/2018
Operator shall comply with 1000-Series Rules for Interim Reclamation. All areas not in use for production activities shall be reclaimed in accordance with the 1000-Series Rules within 6 months of the spud date for the approved well. In the event, additional operations are to occur within 12 months of the spud date, Operator shall submit a Rig Schedule showing a scheduled timeline of additional drilling operations via Form 4 Sundry. If additional drilling operations have not commenced at 12 months, Operator shall submit a Variance Request via Form 4 Sundry for compliance with additional bonding requirements as identified in the NTO for Interim Reclamation prior to the 12 month deadline.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Dust controlForm: (02A )
400745622
3/3/2015
Fugitive Dust: All practicable measures to control fugitive dust caused by the operation, including but not limited to wetting the soil with fresh water via a water truck equipped with a spreader bar if deemed necessary.
ConstructionForm: (02A )
400745622
3/3/2015
MLVT Setback Mitigation Bonanza Creek Energy acknowledges and will comply with the “COGCC Policy On the Use of Modular Large Volume Tanks in Colorado” dated June 13, 2014. The following procedure describes BCEI standard construction and mitigation practices for setting Modular Large Volume Storage Tanks (MLVTs) located within 1000’ of a Building Unit. 1) Light: Any lighting will be kept below 12 ft., the height of the MLVTs, and directed downwards and towards the interior of the location. 2) Noise: Water pumps will be placed on opposite sides of the MLVTs from the residence. 3) Dust: Water will be laid on county and private roads as needed to control dust near the building unit. 4) Any MLVT located up gradient from a building will have a berm or secondary containment on the down gradient side to minimize potential adverse impacts to the building unit.
ConstructionForm: (02A )
400745622
3/3/2015
Visual Mitigation: The MLVTs shall be painted in uniform, non-contrasting, non-reflective color tones with the colors matched to but slightly darker than the surrounding landscape.
ConstructionForm: (02A )
400745622
3/3/2015
Fencing: Unless directed other wise by the surface owner, the Location shall be adequately fenced to restrict access by unauthorized persons.
Drilling/Completion OperationsForm: (02A )
401594971
9/21/2018
Test separators and associated flow lines, sand traps and emission control systems shall be installed on-site to accommodate green completions techniques. When commercial quantities of salable quality gas are achieved at each well, the gas shall be immediately directed to a sales line or shut in and conserved. If a sales line is unavailable or other conditions prevent placing the gas into a sales line, Bonanza Creek shall not produce the wells without an approved variance per Rule 805.b.(3)C.
ConstructionForm: (04 )
402030961
5/14/2019
Bonanza Creek Energy acknowledges and will comply with the “COGCC Policy On the Use of Modular Large Volume Tanks in Colorado” dated June 13, 2014.