| Environmental | Form: (04) 400536142 01/09/2014 | MOC will be allowed to operate the subject pit until 03/3/2014, by which time MOC will either convert the pit to a Centralized Exploration and Production Waste Management Facility under an approved Form 28 or close the pit under an approved Form 27. No further extensions will be granted. |
| Environmental | Form: (04) 400780794 02/04/2015 | Sampling frequency approved as follows:
1) Monitoring wells (MW-01 - MW-04) will be sampled twice a year (Spring 2015, Oct-Nov 2015) and so on until benzene concentration is <0.005 mg/L (at least the two sampling events this year). The reason for sampling in May and Nov. is to capture two extreme conditions, high and low flow.
2) Surface water as specified in the Form 28, approved May 2015. One more sampling around peak of snowmelt/runnoff, Spring 2015.
Note: Spring surface sampling and MWs sampling could be done during same sampling event.
|