Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
LOCATION420175Terrace
36-32M
FUNDARE RESOURCES OPERATING COMPANY LLC
10773
CL
7/3/2019
IGO CREEK
38310
WELD  123
SWNE 36 10N59W 6
420175View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A)
400094844
10/19/2010
Access road will be constructed such that any potential seasonal runoff through the drainage that runs west to east across Section 36 will not be impeded. Appropriate measures may include, but not be limited to appropriate sized culvert(s) to allow sufficient flow beneath the access road. Low water crossings will be constructed to prevent sediment from the access road from entering the drainage.
OGLAForm: (02A)
400094844
10/19/2010
Site-specific best management practices must be implemented to prevent fluid and/or sediment runoff from the access road from entering the drainage that runs west to east across Section 36.
OGLAForm: (02A)
400094844
10/19/2010
Provide notice to COGCC 48 hours prior to the commencement of construction activities.
 
COGIS - Best Management Practice Results
No records to display.