| OGLA | Form: (02A) 400076009 08/16/2010 | Operator must implement site-specific best management practices in accordance with good engineering practices, including, but not limited to, construction of a berm or diversion dike, site grading, or other comparable measures, sufficient to protect the ephemeral stream located 400 feet to the South east of the oil and gas location from a release of drilling, completion, produced fluids, and chemical products. |