LOCATION418660Stewart
36-13H (PL36SW)
QB ENERGY OPERATING LLC
10844
AC
8/4/2011
PLATEAU
69300
MESA  077
Lot 4 36 9S96W 6
418660View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
AgencyForm: (02A)
400061898
06/15/2010
No portion of any pit that will be used to hold liquids shall be constructed on fill material, unless the pit and fill slope are designed and certified by a professional engineer, subject to review and approval by the director prior to construction of the pit. The construction and lining of the pit shall be supervised by a professional engineer or their agent. The entire base of the pit must be in cut.
AgencyForm: (02A)
400061898
06/28/2010
All pits, (reserve pit if constructed, frac pit) must be lined or closed loop system must be implemented during drilling.
AgencyForm: (02A)
400061898
06/28/2010
Operator must ensure 110 percent secondary containment for any volume of fluids contained at well site during drilling and completion operations. If fluids are conveyed via pipeline, operator must implement best management practices to contain any unintentional release of fluids.
AgencyForm: (02A)
400061898
06/28/2010
The moisture content of any drill cuttings in a cuttings pit, trench, or pile shall be as low as practicable to prevent accumulation of liquids greater than de minimis amounts. At the time of closure, the drill cuttings must also meet the applicable standards of table 910-1.
 
COGIS - Best Management Practice Results
No records to display.