Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
LOCATION417324State
16-11-9-60H
VERDAD RESOURCES LLC
10651
AC
4/1/2025
DJ HORIZONTAL NIOBRARA
16950
WELD  123
NWNW 16 9N60W 6
417324View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A)
400103581
11/02/2010
Operator is prohibited from allowing any fluids to flow back to the fresh water Frac Pit.
OGLAForm: (02A)
400103581
11/02/2010
If fresh water for the Frac Pit does not originate from a municipality or an irrigation source (well, pond, canal, etc.), please provide the source of origination to the COGCC.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Storm Water/Erosion ControlForm: (02A )
400435324
11/20/2013
Operator has designed the well pad with insloping and a storm water control ditch to prevent storm water run-on/runnoff and the release of luids from the location. See attached Construction Layout Drawing.
Material Handling and Spill PreventionForm: (02A )
400435324
11/20/2013
Operator will ensure 110 percent secondary containment for any volume of fluids contained at the well site during drilling and completion. Operator will implement best management practices to contain any unintentional release of fluids. Operator shall not allow any fluids to flow back to the Fresh Water Storage Pit/Pond.
ConstructionForm: (02A )
400435324
11/20/2013
The location will be fenced and the fenced area will include the Fresh Water Storage Pit.
Drilling/Completion OperationsForm: (02A )
400435324
11/20/2013
Frresh water for the Fresh Water Storage Pit comes from water provider; water sources permitted for consumable indstrial use. Presh Water Storage Pit shall contain fresh water only and signage prohibiting the use of the pit for any fluid that does not come from municipal, irrigation or surface water source. Operator will implement interim relcamation measure immediately after construction of the location to stabilize cut and fill slopes, stabilize the topsoil and spoil stockpiles, establish desirable vegetation and control weeds ont he location.