Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
LOCATION415946COX
1161-34-42
8 NORTH LLC
10575
AC
6/1/2023
GROVER
33380
WELD  123
NWSE 34 11N61W 6
415946View Related
 
COGIS - Conditions of Approval Results
No records to display.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
PROPOSED BMPsForm: (07 )
0
1/23/2012
PETRO- CANADA RESOURCES (USA) INC. STORMWATER MANAGEMENT PROGRAM Petro - Canada Resources (USA) Inc. (PCR) has in place Stormwater Management Plans to ensure compliance with the Colorado Oil & Gas Conservation Commission (COGCC) and the Colorado Department of Public Health and Environment ( CDPHE) requirements. The CDPHE Stormwater Management Plan covers construction activities and the COGCC plan addresses post- construction activities. PCR utilizes sediment containment systems, which includes silt fencing, straw bales, erosion control blankets, berms, etc. Erosion and sediment control BMP's are dependent upon site slopes, drainage patterns and quantities, and other site - specific conditions. BMP's will be applied on a site specific basis and not all BMP's will be used at each construction site. PCR strives to use BMP's that minimize surface disturbance and adverse environmental effects, such as erosion and sediment production. A copy of PCR's Stormwater Management Plan is kept in our field offices in LaSalle and Grover and our regional office in Denver.