Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
LOCATION414601JOSEPH J.C. PAINE
NO. 1 ANADARKO
PAINE* JOSEPH J.C. DBA PAINE PETROLEUM COMPANY LLC
10317
CL
6/17/2020
SECOND CREEK
76900
AURORA/ADAMS  001
SENE 7 3S65W 6
414601View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
AgencyForm: (02A)
1692963
11/03/2009
<style type="text/css"> p {margin:0px 0px 0px 2px;} ul {margin-top:2px;margin-bottom:2px;} ol {margin-top:2px;margin-bottom:2px;} H1 {font-family:Arial;font-size:28px;text-align:Left;vertical-align:Middle;color:#000000;font-weight:bold;} H2 {font-family:Arial;font-size:24px;text-align:Left;vertical-align:Middle;color:#000000;font-weight:bold;} H3 {font-family:Arial;font-size:18px;text-align:Left;vertical-align:Middle;color:#000000;font-weight:bold;} .Normal {font-family:Arial;font-size:14px;text-align:Left;vertical-align:Middle;color:#000000;} .TableDefault {border-collapse:collapse;border:1px solid #000000;} .TableDefault th {padding:2px;vertical-align:top;text-align:left;border:1px solid #000000;} .TableDefault td {padding:2px;vertical-align:top;text-align:left;border:1px solid #000000;} </style> <p><span class="Normal">Location may be in a sensitive area due to shallow groundwater; therefore if drilling pits intercept groundwater </span><span class="Normal">the pit must be lined or a closed loop system used</span></p>
AgencyForm: (02A)
1692963
11/03/2009
<style type="text/css"> p {margin:0px 0px 0px 2px;} ul {margin-top:2px;margin-bottom:2px;} ol {margin-top:2px;margin-bottom:2px;} H1 {font-family:Arial;font-size:28px;text-align:Left;vertical-align:Middle;color:#000000;font-weight:bold;} H2 {font-family:Arial;font-size:24px;text-align:Left;vertical-align:Middle;color:#000000;font-weight:bold;} H3 {font-family:Arial;font-size:18px;text-align:Left;vertical-align:Middle;color:#000000;font-weight:bold;} .Normal {font-family:Arial;font-size:14px;text-align:Left;vertical-align:Middle;color:#000000;} .TableDefault {border-collapse:collapse;border:1px solid #000000;} .TableDefault th {padding:2px;vertical-align:top;text-align:left;border:1px solid #000000;} .TableDefault td {padding:2px;vertical-align:top;text-align:left;border:1px solid #000000;} </style> <p><span class="Normal">Operator must implement best management practices to contain any unintentional release of fluids.</span></p>
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
PROPOSED BMPsForm: (07 )
0
1/23/2012
JOSEPH J.C. PAINE BEST MANAGEMENT PRACITCES SUMMARY Stormwater management plans (SWMP) are in place to ensure compliance with the Colorado Oil & Gas Conservation Commission and the Colorado Department of Health and Environment requirements. Joseph J.C. Paine utilizes sediment containment systems which include silt fencing,straw bales, berms, erosion control blankets, etc. BMP's used will vary according to site slopes, drainage patterns, and other site-specific conditions. A copy of the SWMP is kept in our office. Spill Prevention Plan is in place to address any spills associated with Joseph J.C. Paine operations. Any waste and trash will removed from the site for disposal. Routine maintenance will be limited to fueling and lubrication of equipment. Drip Pans will be used during fueling and maintenance to contain spills or leaks, Hay bales will be placed as sound barriers on locations that are close to residence as required.