Environmental | Form: (04 ) 400864360 11/3/2015 | IF LOCATIONS ARE IN A SENSITIVE AREA BECAUSE OF ITS PROXIMITY TO SURFACE WATER OPERATOR MUST ENSURE 110 PERCENT SECONDARY CONTAINMENT FOR ANY VOLUME OF FLUIDS CONTAINED AT THE WATER HANDLING FACILITY SITE DURING NATURAL GAS DEVELOPMENT ACTIVITIES AND OPERATIONS; INCLUDING, BUT NOT LIMITED TO, CONSTRUCTION OF A BERM OR DIVERSION DIKE, DIVERSION/COLLECTION TRENCHES WITHIN AND/OR OUTSIDE OF BERMS/DIKES, SITE GRADING, OR OTHER COMPARABLE MEASURES (I.E., BEST MANAGEMENT PRACTICES (BMPS) ASSOCIATED WITH STORMWATER MANAGEMENT) SUFFICIENTLY PROTECTIVE OF NEARBY SURFACE WATER. ANY BERM CONSTRUCTED AT THE WELL PAD LOCATION WILL BE STABILIZED, INSPECTED AT REGULAR INTERVALS (AT LEAST EVERY 14 DAYS), AND MAINTAINED IN GOOD CONDITION. |
Environmental | Form: (04 ) 400864360 11/3/2015 | PRODUCED WATER OR FLOWBACK WATER OR OTHER EXPLORATION AND
PRODUCTION WASTE SHALL NOT BE TEMPORARILY STORED IN MODULAR
LARGE VOLUME STORAGE TANKS (MLVSTs). PRODUCED WATER OR
FLOWBACK WATER SHALL BE TEMPORAILY STORED IN FRAC TANKS |
Environmental | Form: (04 ) 400864360 11/3/2015 | PROVIDE PRECAUTIONS/SECONDARY CONTAINMENT THAT WILL BE INPLACE
FOR BOTH BELOW GRADE AND ABOVE GRADE PIPELINES AS THEY CROSS
STREAMS, SENSITVE AREAS, OR ALONG SENSITIVE AREAS. |
Environmental | Form: (04 ) 400864360 11/3/2015 | OXY AND WPX WILL EACH SEPERATELY SUBMIT AN ANNUAL REPORT TO
THE COGCC SUMMARIXZING THE TRANSFER OF PRODUCTION WATER (BOTH
AS TRANSFER AND RECEIVING OPERATOR) DURING THE CALENDAR YEAR
AND INCUDING LABORATORY ANALYTICAL RESULTS FOR REPRESENTATIVE
SAMPLES(S) OF THE PRODUCTION WATER PROVIDED AS THE
TRANSFER/RECIEVER. THE ANNUAL REPORT SHALL BE SUBMITTED ON OR
BEFORE THE ANNIVERSAY OF THE FIRST DATE OF TRANSFER. |
Environmental | Form: (04 ) 400864360 11/3/2015 | BOTH OXY AND WPX SHALL NOTIFY THE COGCC VIA SUNDRY
IMMEDIATELY UPON TERMINATION OF ACTIVITIES. |
Environmental | Form: (04 ) 400864360 11/3/2015 | OPERATOR PROPOSES THAT THIS FACILITY WILL BE IN OPERATION FOR A
PERIOD OF 90 DAYS. THIS TRANSFER CAN BE EXTENDED VIA SUNDRY
REQUEST, HOWEVER, SHOULD THE OPERATION OF THIS FACILITY CONTINUE
MORE THAN ONE YEAR, A FORM 28 SHALL BE SUBMITTED AND APPROVED
BEFORE THE ONE-YEAR ANNIVERSARY DATE OF THE FIRST USE OF THE
TRANSFER FACIITY/LOCATION. |
Environmental | Form: (04 ) 400864360 11/3/2015 | OPERATOR MUST IMPLEMENT BEST MANAGEMENT PRACTICES TO CONTAIN
ANY UNINTENTIONAL RELEASE OF FLUIDS, INCLUDING ANY FLUIDS
CONVEYED VIA TEMPORARY SURFACE PIPELINES. |
Environmental | Form: (04 ) 400864360 11/3/2015 | Provide frequency or schedule for monitoring the OXY flowlines that will be used to
convey fluids for this transfer. |
Environmental | Form: (04 ) 400864360 11/3/2015 | Provide the most current flowline integrity results of the OXY flowlines that will be
used to convey fluids for this transfer. |
Environmental | Form: (04 ) 400864360 11/3/2015 | Provide history of spills or releases from the segments of OXY flowlines that will be
used to convey fluids for this transfer. |
Environmental | Form: (04 ) 403166217 9/16/2022 | The COGCC conditionally approves the proposed Alternative Sampling plan under COGCC Rule 909.j .(6). If initial sample results indicate non-homogeneity in water collected from the same water producing formation, the COGCC will require the operator to collect additional produced water samples.
If additional water samples are required, the operator will provide the COGCC with an updated sampling plan through a Sundry Notice for review prior to collecting additional samples.
|