Planning | Form: (02A ) 400857908 2/5/2016 | Fire Extinguishers will be provided and the number to the local fire department will be provided to all workers. |
Traffic control | Form: (02A ) 400857908 2/5/2016 | Contractor's vehicles will be contaied to location, no other traffic is expected. |
General Housekeeping | Form: (02A ) 400857908 2/5/2016 | The site will be kept clean through good contractor house keeping. |
Dust control | Form: (02A ) 400857908 2/5/2016 | We will use a water truck to water the roads and location to mitigate the occurence of dust. |
Construction | Form: (02A ) 400857908 2/5/2016 | There will be fencing around the work area. |
Construction | Form: (02A ) 400857908 2/5/2016 | Guy Line anchors will be installed to code by the rig company. |
Construction | Form: (02A ) 400857908 2/5/2016 | Access roads will be built in accorfance to rule 604.c(2)S. |
Construction | Form: (02A ) 400857908 2/5/2016 | There will not be any lighting mitigation during drilling or completing the well. We will only be operating during daylight hours, so excessive lighting will not bother the nearby building unit owner. |
Noise mitigation | Form: (02A ) 400857908 2/5/2016 | Construct sound wall to reduce noise made by the operations. |
Odor mitigation | Form: (02A ) 400857908 2/5/2016 | No odor is anticipated during operations. |
Drilling/Completion Operations | Form: (02A ) 400857908 2/5/2016 | Will only operate during daylight hours. |