| Storm Water/Erosion Control | Form: (02A ) 401893864 7/8/2020 | Silt fences will be installed on low side of drill site. To prevent soil erosion site will be disked and straw crimped in. |
| Material Handling and Spill Prevention | Form: (02A ) 401893864 7/8/2020 | Operator will visit the Location on a weekly basis and inspect the Location for spills or releases. |
| Material Handling and Spill Prevention | Form: (02A ) 401893864 7/8/2020 | Operator will construct the production facilities within lined secondary containment using steel ring berms and a synthetic liner. |
| Material Handling and Spill Prevention | Form: (02A ) 401893864 7/8/2020 | A closed loop system will be deployed. A pulling unit and flat tank are the only items required for cased hole re-entry, and there will be no pits constructed or drill cuttings generated. |
| Final Reclamation | Form: (02A ) 401893864 7/8/2020 | Topsoil will be separated and spread on drill site as final operation before reseeding operations. Disturbed areas will be reseeded within 6 months weather permitting. |