Material Handling and Spill Prevention | Form: (02A ) 400230181 1/15/2012 | A combination V ditch/berm wall will be constructed on the perimeters of the location.
Installation of silt fencing around the perimeter of the location.
|
Storm Water/Erosion Control | Form: (02A ) 400230181 1/15/2012 | Installation of silt fencing around the perimeter of the location.
Erosion Control Blanket or Hydro-mulch around perimeter.
Topsoil and overburden piles will be tracked and compacted to minimize soil erosion.
|