Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
LOCATION335967NPR
B16-596 Pad
QB ENERGY OPERATING LLC
10844
AC
2/1/2021
GRAND VALLEY
31290
GARFIELD  045
NWNE 16 5S96W 6
335967View Related
 
COGIS - Conditions of Approval Results
No records to display.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
PlanningForm: (02A )
401758966
11/30/2018
Use or modify existing roads where possible. Maximize the use of directional drilling to minimize habitat loss/fragmentation. Maximize use of remote telemetry for well monitoring to minimize traffic.
General HousekeepingForm: (02A )
401758966
11/30/2018
Caerus will comply with Rule 609 Statewide Groundwater Baseline Sampling and Monitoring. Caerus will comply with Rule 603.f. statewide equipment, weeds, waste, and trash requirements.
WildlifeForm: (02A )
401758966
11/30/2018
September 2017 - Caerus Piceance LLC (Caerus) agreed to the Amended and Restated Wildlife Mitigation Plan (WMP) for Encana’s proposed oil and gas operations on the North Parachute Ranch (NPR) property. Caerus received authorization from Colorado Parks and Wildlife (CPW) to transfer the EnCana Wildlife Mitigation Plan Agreement (WMPA) to Caerus’ existing WMPA. Caerus is currently adhering to all aspects of both WMPAs through Caerus’ current best management practices.
Storm Water/Erosion ControlForm: (02A )
401758966
11/30/2018
Stormwater is addressed under a field-wide Stormwater Management Plan (CDPHE Certification #COR037689). Run-on protection and run-off controls will be installed prior to the beginning of construction activities, with consideration given to worker safety, wildlife, and site access.
ConstructionForm: (02A )
401758966
11/30/2018
Pad is built and will need expansion. Any stockpile(s) for topsoil and excess cut material will be located in work areas surrounded by the BMPs as shown on the Construction Layout Drawings. Stormwater BMPs will be installed per details in the Stormwater Management Plan (SWMP) and as shown on the Construction Layout Drawings. Disturbed area of site will be left in a surface roughened condition when feasible. BMPs will be protected, inspected and repaired as necessary. Dust mitigation practices will be utilized. Existing buried flow and water lines in place. Any new flowline installations will be performed in accordance with new flowline guidance provided by the COGCC concerning Rules 1101 and 1102. Berms or other containment devices shall be constructed to be sufficiently impervious (corrugated steel with synthetic liner) to adequately contain any spilled or released material around crude oil, condensate, and produced water storage tanks, while also ensuring the adequate prevention of significant adverse environmental impacts.
Drilling/Completion OperationsForm: (02A )
401758966
11/30/2018
Closed loop system will be used. No pits will be built. An enclosed flare stack will be used. Caerus will ensure 110 percent secondary containment for any potential volume of fluids that may be released.
Interim ReclamationForm: (02A )
401758966
11/30/2018
Once all topsoil has been distributed across the site, the location is then seeded by drill seeding methods or broadcast seeding. Re-vegetation is accomplished as soon as practical following the preparation of a site for final stabilization. Seeding will be done when seasonal or weather conditions are most favorable. On terrain where drill seeding is appropriate, seed may be planted using a drill equipped with a depth regulator to ensure proper depth of planting. Where possible, recountouring to help control run-on and run-off will be done.
Final ReclamationForm: (02A )
401758966
11/30/2018
Re-contouring: The disturbed areas surrounding the well location, including the access road will be re-contoured to blend as nearly possible with the natural topography. Final grading of back-filled and cut slopes will be done to prevent erosion and encourage establishment of vegetation. Existing drainages will be re-established. Re-vegetation: The long term objective is to establish a self-perpetuating plant community that is compatible with and capable of supporting the identified land use. Noxious weeds will be treated in accordance with applicable COGCC rules.