LOCATION335865LONG RIDGE
M15 595
QB ENERGY OPERATING LLC
10844
AC
1/1/2026
PARACHUTE
67350
GARFIELD  045
SWSW 15 5S95W 6
335865View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A)
400093108
09/29/2010
Any pit constructed to hold fluids (reserve pit, production pit; except for flare pit) must be lined.
OGLAForm: (02A)
400093108
09/29/2010
The nearby hillside must be monitored for any day-lighting of drilling fluids throughout the drilling of the surface casing interval.
OGLAForm: (02A)
400093108
09/29/2010
Operator must ensure 110 percent secondary containment for any volume of fluids contained at well site during drilling and completion operations; including, but not limited to, construction of a berm or diversion dike, diversion/collection trenches within and/or outside of berms/dikes, site grading, or other comparable measures (i.e., BMPs associated with stormwater management) sufficiently protective of the nearby surface water. If fluids are conveyed via pipeline, operator must implement best management practices to contain any unintentional release of fluids.
OGLAForm: (02A)
400093108
09/29/2010
The moisture content of any drill cuttings in a cuttings pit, trench, or pile shall be as low as practicable to prevent accumulation of liquids greater than de minimis amounts. At the time of closure, the drill cuttings must also meet the applicable standards of table 910-1.
OGLAForm: (02A)
400093108
09/29/2010
No portion of any pit that will be used to hold liquids shall be constructed on fill material, unless the pit and fill slope are designed and certified by a professional engineer, subject to review and approval by the director prior to construction of the pit. The construction and lining of the pit shall be supervised by a professional engineer or their agent. The entire base of the pit must be in cut.
OGLAForm: (02A)
400093108
09/29/2010
Notice to Operators (NTO) Drilling Wells on the Roan Plateau in Garfield County: Comply with all provisions of the June 12, 2008 Notice to Operators (NTO) Drilling Wells Within ¾ Mile of the Rim of the Roan Plateau in Garfield County – Pit Design, Construction, and Monitoring Requirements. At a minimum, the following condition of approval (COA) will apply: All pits must be lined.
EnvironmentalForm: (04)
400479483
10/02/2013
Before backfilling the pit, statistically representative DISCRETE samples of walls/bottom of the pit will be collected and sampled for TPH and PAHs. Representative discrete confirmation samples will be collected from the landfarmed soil for TPH, PAHs and SAR, pH, Arsenic. Arsenic background samples from nearby native soil (upgradient and cross-gradient of the pad) will be collected to compare arsenic background concentrations with impacted soil arsenic concentrations. A form 04, Notice of Completion will be submitted when pit and landfarmed material are in compliance with Table 910-1 and arsenic concentrations are below or at the max background concentration + 10%.
PermitForm: (04)
401246092
03/31/2017
The operator-of-record of this location is subject to the September 1, 2017 extended deadline granted by this variance to comply with the March 1, 2017 requirements of the COGCC Notice to Operators: Procedure for Preset Conductors (rev October 6, 2016) to have performed one of the following options: (1) plug the conductors and perform reclamation, (2) request to keep the conductors and provide additional financial assurance, or (3) submit a Rule 502.b variance for an alternative plan.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Drilling/Completion OperationsForm: (02A )
400093108
10/28/2010
The following list of Best Managenment Practices (BMP’s) that will be implemented by Berry Petroleum Company during the pad construction, well drilling, well completion, natural gas production and reclamation phases of activity on the Long Ridge M15 595 well Pad. A total of 10 wells will be directionally drilled from the M15 well pad (4 wells TD'd, waiting on completion, 6 proposed wells). Directional drilling has enabled Berry Petroleum Company to reduce the number of well pads required for gas recovery and will minimize surface damage. The M15 well pad will be constructed adjacent to an existing road. This eliminates the need to construct an additional road for access and avoids additional surface disturbance. In general, Berry Petroleum Company will comply with all applicable federal, state and local statues, rules, regulations and ordinances, including those of OSHA, the COGCC and the CDPHE. Relating to safety and the environment. During construction of the well pad, topsoil will be isolated from other soils and placed and stacked per COGCC requirements. All cuts, fill slopes, pits and topsoil piles will be stabilized and revegetated immediately following construction. The pad will be constructed in compliance with CDPHE Stormwater Discharge regulations. Bear proof dumpsters/trash cans will be used on the location for solid/food waste disposal. Noxious weeds will be controlled. Temporary housing for the drill rig crews will meet all Garfield County regulations. The housing quarters will receive 24/7 supervision by Berry Petroleum Company. Production tanks shall be placed on a non-permeable liner and surrounded by a metal containment wall at least 3 feet in height.