| Environmental | Form: (04) 401606637 04/20/2018 | Cuttings will be stored temporarily on the D23 Site.
Within 2 weeks of approval of this Sundry:
•Provide a time frame for the storage of cuttings on the D23 Site (update with Form 4 as necessary).
•Provide a site map of the proposed cuttings storage area.
•Describe the BMPs maintained during storage of cuttings on the D23 Site, including inspection frequency. |
| Environmental | Form: (04) 401606637 04/20/2018 | Cuttings shall not be treated on the D23 Site (See Rule 907.e.(1)
BMPS shall be inspected and maintained after precipitation events. The Location perimeter berm is not considered secondary containment or a proper BMP for the E&P waste storage.
Operator shall be in compliance with Rule 907.a.
|
| Environmental | Form: (04) 401606637 04/27/2018 | The moisture content of any drill cuttings transported from the N.PARACHUTE-65S96W Location to the K10-597 Location, placed at the K10-597 Location for temporary storage, transported to the N.PARACHUTE-65S96W Location of origin for treatment and reclamation shall be as low as practicable to prevent accumulation of liquids greater than de minimis amounts and to prevent spillage out of trucks during transport. |
| Environmental | Form: (04) 401606637 04/27/2018 | The Operator shall notify the COGCC EPS Staff (Alex Fischer) at alex.fischer@state.co.us and via a Sundry Form 4 when the transfer back to the N.PARACHUTE-65S96W Location begins. |