LOCATION335658CHEVRON
036B 596
QB ENERGY OPERATING LLC
10844
AC
2/1/2025
GRAND VALLEY
31290
GARFIELD  045
SWSE 36 5S96W 6
335658View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
Reclamation SpecialistForm: (04)
404283422
11/06/2025
Approval/Passing of this Form is not an endorsement of the reclamation plan that has been attached/included; Location will need to meet 1000 series requirements in order to pass reclamation. If it is determined that reclamation is not progressing towards 1000 series standards, additional remedial efforts may be required; the reclamation plan should be updated based on the site’s conditions, and implemented in order to ensure standards are met.
Reclamation SpecialistForm: (04)
404283422
11/06/2025
Soils to be placed over the impacted material during reclamation efforts shall be done so in accordance with Rule 1003.e.(2); Operator shall implement Best Management Practices to ensure that topsoil is replaced and protected in such a manner as to prevent mixing with subsoils, impacted materials or other contaminants.
Reclamation SpecialistForm: (04)
404283422
11/06/2025
As to any future remedial efforts requiring excavation: topsoil salvage, soil segregation and protection of soils shall be performed in accordance with Rule 1002.b and 1002.c.
Reclamation SpecialistForm: (04)
404283422
11/06/2025
In the event table 915-1 exceedances of EC, SAR, or pH boron remain, Operator's 915.b request to leave impacts in situ, and covered with a minimum of 7 feet of soil is approved.
Reclamation SpecialistForm: (04)
404283422
11/06/2025
Location is active at time of review with no plan to conduct final reclamation. Approval of this 915.b is based on current site conditions, however, the reclamation plan will require updating in the event surface conditions change, impacts are discovered during future facility closure operations, or future spill/remediation projects.
Reclamation SpecialistForm: (04)
404283422
11/06/2025
Temporary, site specific stormwater and erosion control BMPs shall be installed and maintained per good engineering practices during construction activities. BMPs shall also be maintained until long-term stabilization has been achieved; if it is determined that a specific BMP is insufficient to minimize erosion, degradation and sediment transport, or cannot be implemented per installation specification, or maintained in effective operating condition, then alternative BMPs that are better suited to meet the site’s conditions should be considered and applied, or used in conjunction.
 