Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
LOCATION335397Mobil
GM 24-27
TEP ROCKY MOUNTAIN LLC
96850
AC
12/20/2022
GRAND VALLEY
31290
GARFIELD  045
SESW 27 6S96W 6
335397View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
AgencyForm: (02A)
400069334
07/13/2010
No portion of any pit that will be used to hold liquids shall be constructed on fill material, unless the pit and fill slope are designed and certified by a professional engineer, subject to review and approval by the director prior to construction of the pit. The construction and lining of the pit shall be supervised by a professional engineer or their agent. The entire base of the pit must be in cut.
AgencyForm: (02A)
400069334
07/29/2010
Reserve pit must be lined or closed loop system must be implemented during drilling.
AgencyForm: (02A)
400069334
07/29/2010
The moisture content of any drill cuttings in a cuttings pit, trench, or pile shall be as low as practicable to prevent accumulation of liquids greater than de minimis amounts. At the time of closure, the drill cuttings must also meet the applicable standards of table 910-1.
AgencyForm: (02A)
400069334
07/29/2010
Operator must ensure 110 percent secondary containment for any volume of fluids contained at well site during drilling and completion operations. If fluids are conveyed via pipeline, operator must implement best management practices to contain any unintentional release of fluids.
 
COGIS - Best Management Practice Results
No records to display.