Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
LOCATION335191CLOUGHT-66S94W
27NENW
TEP ROCKY MOUNTAIN LLC
96850
AC
8/22/2016
RULISON
75400
GARFIELD  045
NENW 27 6S94W 6
335191View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (04)
404234759
06/18/2025
Due to proximity to a wetland and surface water, operator will use secondary containment for all tanks and other liquid containers. Operator will implement stormwater BMPs and erosion control measures as needed to prevent sediment and stormwater runoff from entering the wetland and surface water.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
WildlifeForm: (04 )
404234759
6/18/2025
Mule Deer and Elk BMPs 1. Wildlife – Minimization: To minimize the potential for wildlife related traffic accidents, TEP has implemented speed restrictions for all lease roads and requires that all TEP employees and contractors adhere to these posted speed restrictions. 2. Wildlife – Minimization: TEP will make best efforts to minimize operations at these location during winter months by conducting operations, when possible, between 9:00am to 4:00pm when wildlife activity minimal. 3. Wildlife – Minimization: TEP will minimize vehicle numbers and traffic by carpooling to the site whenever possible.
WildlifeForm: (04 )
404234759
6/18/2025
Bald Eagle Roost Site BMPs 1. Wildlife – Avoidance: TEP will complete planned workover activities prior to Bald Eagle Roost Site Timing Limitation (November 15 - March 15). TEP will consult with CPW regarding any workover activities that may be delayed and likely to occur during the Timing Limitation.