LOCATION335013Riley
1
QB ENERGY OPERATING LLC
10844
AC
1/1/2026
GRAND VALLEY
31290
GARFIELD  045
NWNW 17 7S96W 6
335013View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A)
400946310
03/07/2016
Approval of this Form 2A and the subsequent Form 2 for the injection well does not authorize operator the right to inject. Authorization to inject into the selected Formation(s) requires approval of both the Form 31 and the Form 33. Operator will use qualified containment devices for all appropriate chemicals/hazardous materials and injection equipment (pumps) used onsite during the operation of the injection well. All tanks and aboveground vessels containing fluids must have secondary containment structures. All secondary containment structures/areas must be lined. Operator must ensure a minimum of 110 percent secondary containment for the largest structure containing fluids within each bermed area at the facility during operations. The construction and lining of the secondary containment structures/areas shall be supervised by a professional engineer or their agent. Operator shall equip and maintain on all tanks an electronic fluid level monitoring device. Unless otherwise determined by COGCC staff (Bob Koehler) that a water sample of the proposed injection formation is not required, before hydraulic stimulation of the injection well, operator shall collect a groundwater sample from the target Formations (that will be indicated on the future Form 2 for the injection well) and analyze for total dissolved solids (TDS); submit laboratory analytical results to COGCC (emails: bob.koehler@state.co.us and arthur.koelspell@state.co.us).
OGLAForm: (02A)
400946310
03/07/2016
Operator shall pressure test pipelines (flowlines from wellheads to separators to tanks; and any temporary surface lines used for hydraulic stimulation and/or flowback operations) in accordance with Rule 1101.e.(1) prior to putting into initial service any temporary surface or permanent buried pipelines and following any reconfiguration of the pipeline network.
OGLAForm: (02A)
400946310
03/07/2016
Flowback and stimulation fluids must be sent to enclosed tanks, separators, or other containment/filtering equipment before the fluids can be placed into any pipeline storage vessel, or other open top containment located on the well pad; or into tanker trucks for offsite disposal. No open top tanks can be used for initial flowback fluids containment. The flowback and stimulation fluid tanks, separators, or other containment/filtering equipment must be placed on the well pad in an area constructed to be sufficiently impervious to contain any spilled or released material. No additional downgradient berming is required if operator constructs a sufficiently sized perimeter berm. Potential odors associated with the completions process and/or with long term production operations must be controlled/mitigated.
OGLAForm: (02A)
400946310
03/07/2016
Operator must ensure secondary containment for any volume of fluids contained at the well site during drilling and completion operations (as shown on the Construction Layout Drawings, Location Drawing, and Facility Layout Drawing attachments); including, but not limited to, construction of a berm or diversion dike, diversion/collection trenches within and/or outside of berms/dikes, site grading, or other comparable measures (i.e., best management practices [BMPs] associated with fluid containment/control as well as stormwater management for the control of run-on and run-off) sufficiently protective of nearby surface water. Any berm constructed at the well pad location will be stabilized, inspected at regular intervals as required by CDPHE (at least every 14 days and after precipitation events), and maintained in good condition. The design/build of any perimeter berm shall be sized, constructed, and compacted sufficiently to contain fluids during drilling operations, as well as all fluids contained in temporary frac tanks during completion operations. The access road will be maintained as to not allow any sediment to migrate from the access road to nearby surface water or any drainages leading to surface water. Strategically apply fugitive dust control measures, including encouraging established speed limits on private roads, to reduce fugitive dust and coating of vegetation and deposition in water sources.
OGLAForm: (02A)
400946310
03/07/2016
In addition to the notifications required by COGCC listed in the Northwest Notification Policy (Notice of Intent to Construct a New Location, Notice of Intent to Spud Surface Casing, and Notice of Intent to Commence Hydraulic Fracturing Operations) and Rule 316C. COGCC Form 42. FIELD OPERATIONS NOTICE (a. Notice of Intent to Conduct Hydraulic Fracturing Treatment and c. Notice of Construction or Major Change); operator shall notify the COGCC 48 hours prior to pipeline testing (flowlines from wellheads to separators to tanks; and/or any temporary surface lines used for hydraulic stimulation and/or flowback operations) using the Form 42 (as described in Rule 316C.m. Notice of Completion of Form 2/2A Permit Conditions). The appropriate COGCC individuals will automatically be email notified.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
PlanningForm: (02A )
400946310
3/31/2016
Minimize the number, length, and footprint of oil and gas development roads. Use existing roads where possible. Maximize the use of directional drilling to minimize habitat loss/fragmentation. Maximize use of long-term centralized tank batteries to minimize traffic. Maximize use of remote completion/frac operations to minimize traffic. Maximize use of remote telemetry for well monitoring to minimize traffic.
General HousekeepingForm: (02A )
400946310
3/31/2016
Caerus will comply with Rule 609 Statewide Groundwater Baseline Sampling and Monitoring Caerus will comply with Rule 603.f statewide equipment, weeds, waste, and trash requirements.
WildlifeForm: (02A )
400946310
3/31/2016
March 2015 - Caerus Piceance LLC (Caerus) formally requested and received authorization from Colorado Parks and Wildlife (CPW) to transfer the Noble Energy, Inc. (Noble) Wildlife Mitigation Plan Agreement (WMPA) to Caerus’ existing WMPA. Caerus is currently adhering to all aspects of both WMPAs through Caerus’ current best management practices. All garbage and any food items will be placed in bear proof trash containers.
Storm Water/Erosion ControlForm: (02A )
400946310
3/31/2016
Stormwater is addressed under a field-wide Stormwater Management Plan (CDPHE Certification #COR039527). Run-on protection and run-off controls will be installed prior to the beginning of construction activities, as practicable, with consideration given to worker safety, wildlife, and site access.
ConstructionForm: (02A )
400946310
3/31/2016
Stockpiles for topsoil and excess cut material will be located in work areas surrounded by a BMP. Stormwater BMPs will be installed per details in the Stormwater Management Plan (SWMP). Disturbed area of site will be left in a surface roughened condition when feasible. BMPs will be protected, inspected and repaired as necessary. Dust mitigation practices will be utilized. New flowline installations will be performed in accordance with new flowline guidance provided by the COGCC concerning Rules 1101 and 1102. Berms or other containment devices shall be constructed to be sufficiently impervious (corrugated steel with synthetic liner) to adequately contain any spilled or released material around crude oil, condensate, and produced water storage tanks, while also ensuring the adequate prevention of significant adverse environmental impacts.
Drilling/Completion OperationsForm: (02A )
400946310
3/31/2016
Closed loop system will be used. No pits will be built. Completion operations will be performed to ensure adequate prevention of significant adverse environmental impacts. Caerus will ensure 110 percent secondary containment for any potential volume of fluids that may be released.
Interim ReclamationForm: (02A )
400946310
3/31/2016
Once all topsoil has been distributed across the site, the location is then seeded by drill seeding methods or broadcast seeding. Re-vegetation is accomplished as soon as practical following the preparation of a site for final stabilization. Seeding will be done when seasonal or weather conditions are most favorable. On terrain where drill seeding is appropriate, seed may be planted using a drill equipped with a depth regulator to ensure proper depth of planting.
Final ReclamationForm: (02A )
400946310
3/31/2016
Re-contouring: The disturbed areas surrounding the well location, including the access road will be re-contoured to blend as nearly possible with the natural topography. Final grading of back-filled and cut slopes will be done to prevent erosion and encourage establishment of vegetation. Existing drainages will be re-established. Re-vegetation: The long term objective is to establish a self-perpetuating plant community that is compatible with and capable of supporting the identified land use. Noxious weeds will be treated in accordance with applicable COGCC rules.