| OGLA | Form: (02A) 400089643 09/20/2010 | Reserve pit must be lined or closed loop system (which Williams has already indicated on the Form 2A) must be implemented during drilling.
|
| OGLA | Form: (02A) 400089643 09/20/2010 | Location is in a sensitive area because of proximity to surface water; therefore, operator must ensure 110 percent secondary containment for any volume of fluids contained at well site during drilling and completion operations; including, but not limited to, construction of a berm or diversion dike, diversion/collection trenches within and/or outside of berms/dikes, site grading, or other comparable measures sufficiently protective of nearby surface water. If fluids are conveyed via pipeline, operator must implement best management practices to contain any unintentional release of fluids.
|
| OGLA | Form: (02A) 400089643 09/20/2010 | Operator must implement best management practices to contain any unintentional release of fluids.
|
| OGLA | Form: (02A) 400089643 09/20/2010 | The moisture content of any drill cuttings in a cuttings pit, trench, or pile shall be as low as practicable to prevent accumulation of liquids greater than de minimis amounts. At the time of closure, the drill cuttings must also meet the applicable standards of table 910-1.
|
| OGLA | Form: (02A) 400089643 09/20/2010 | No portion of any pit that will be used to hold liquids shall be constructed on fill material, unless the pit and fill slope are designed and certified by a professional engineer, subject to review and approval by the director prior to construction of the pit. The construction and lining of the pit shall be supervised by a professional engineer or their agent. The entire base of the pit must be in cut.
|