Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
LOCATION334813Savage
GV 80-4
TEP ROCKY MOUNTAIN LLC
96850
AC
5/6/2015
PARACHUTE
67350
GARFIELD  045
NESW 4 7S95W 6
334813View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A)
400089643
09/20/2010
Reserve pit must be lined or closed loop system (which Williams has already indicated on the Form 2A) must be implemented during drilling.
OGLAForm: (02A)
400089643
09/20/2010
Location is in a sensitive area because of proximity to surface water; therefore, operator must ensure 110 percent secondary containment for any volume of fluids contained at well site during drilling and completion operations; including, but not limited to, construction of a berm or diversion dike, diversion/collection trenches within and/or outside of berms/dikes, site grading, or other comparable measures sufficiently protective of nearby surface water. If fluids are conveyed via pipeline, operator must implement best management practices to contain any unintentional release of fluids.
OGLAForm: (02A)
400089643
09/20/2010
Operator must implement best management practices to contain any unintentional release of fluids.
OGLAForm: (02A)
400089643
09/20/2010
The moisture content of any drill cuttings in a cuttings pit, trench, or pile shall be as low as practicable to prevent accumulation of liquids greater than de minimis amounts. At the time of closure, the drill cuttings must also meet the applicable standards of table 910-1.
OGLAForm: (02A)
400089643
09/20/2010
No portion of any pit that will be used to hold liquids shall be constructed on fill material, unless the pit and fill slope are designed and certified by a professional engineer, subject to review and approval by the director prior to construction of the pit. The construction and lining of the pit shall be supervised by a professional engineer or their agent. The entire base of the pit must be in cut.
 
COGIS - Best Management Practice Results
No records to display.