Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
LOCATION334142ORCHARD UNIT
15-12H2 (D14OU)
QB ENERGY OPERATING LLC
10844
AC
1/1/2026
GRAND VALLEY
31290
MESA  077
NWNW 14 8S96W 6
334142View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A)
400097155
10/19/2010
Operator must implement best management practices to contain any unintentional release of fluids. All pits containing fluids (if constructed; reserve pit, production pit, frac pit) must be lined.
OGLAForm: (02A)
400097155
10/19/2010
If fluids are conveyed via pipeline, operator must implement best management practices to contain any unintentional release of fluids.
OGLAForm: (02A)
400097155
10/19/2010
Operator must ensure 110 percent secondary containment for any volume of fluids contained at well site during drilling and completion operations; including, but not limited to, construction of a berm or diversion dike, diversion/collection trenches within and/or outside of berms/dikes, site grading, or other comparable measures (i.e., BMPs associated with stormwater management) sufficiently protective of the nearby surface water.
OGLAForm: (02A)
400097155
10/19/2010
The moisture content of any drill cuttings in a cuttings pit, trench, or pile shall be as low as practicable to prevent accumulation of liquids greater than de minimis amounts. At the time of closure, the drill cuttings must also meet the applicable standards of table 910-1.
OGLAForm: (02A)
400097155
10/19/2010
Either a lined drilling pit or a closed loop system (which operator has already indicated on the Form 2A) must be implemented.
 
COGIS - Best Management Practice Results
No records to display.