COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
OGLAForm: (02A)
400391955
08/20/2013
GROUNDWATER MONITORING COA: Operator shall comply with Rule 609. STATEWIDE GROUNDWATER BASELINE SAMPLING AND MONITORING.
OGLAForm: (02A)
400391955
08/20/2013
GENERAL SITE COAs: Notify the COGCC 48 hours prior to start of pad construction, rig mobilization, spud, and start of hydraulic stimulation operations using Form 42 (the appropriate COGCC individuals will automatically be email notified, including the LGD for hydraulic stimulation operations). Reserve pit, or any other pit used to contain/hold fluids, if constructed, must be lined or a closed loop system must be implemented during drilling. The access road will be constructed to prevent sediment migration from the access road to nearby surface water or any drainages leading to other nearby surface waters. Operator must implement best management practices to contain any unintentional release of fluids, including any fluids conveyed via temporary surface pipelines or buried permanent pipelines. Operator must ensure secondary containment for any volume of fluids contained at well site during drilling and completion operations; including, but not limited to, construction of a berm or diversion dike, diversion/collection trenches within and/or outside of berms/dikes, site grading, or other comparable measures (i.e., best management practices (BMPs) associated with stormwater management) sufficiently protective of nearby surface water. Any berm constructed at the well pad location will be stabilized, inspected at regular intervals (at least every 14 days), and maintained in good condition. The moisture content of any cuttings in a cuttings pit, trench, or pile shall be as low as practicable to prevent accumulation of liquids greater than de minimis amounts. At the time of closure, if the drill cuttings are to be left onsite, they must also meet the applicable standards of table 910-1. If the well is to be hydraulically stimulated, then flowback and stimulation fluids must be sent to tanks, separators, or other containment/filtering equipment before the fluids can be placed into any pipeline, storage vessel, or lined pit (only if an amended Form 2A has been submitted/approved and a Form 15 Earthen Pit Permitted has been submitted/approved) located on the well pad; or into tanker trucks for offsite disposal. The flowback and stimulation fluid tanks, separators, or other containment/filtering equipment must be placed on the well pad in an area with additional downgradient perimeter berming. The area where flowback fluids will be stored/reused must be constructed to be sufficiently impervious to contain any spilled or released material. Berms or other containment devices shall be constructed to be sufficiently impervious (preferably corrugated steel with poly liner) to contain any spilled or released material around crude oil, condensate, and produced water storage tanks.
OGLAForm: (04)
401308405
06/14/2017
Operator shall notify COGCC OGLA specialist (Dave Kubeczko via phone: 970-309-2514 [cell] and at email : dave.kubeczko@state.co.us) and FIU Inspector (Emily Waldron via phone: 970-276-9395 [office] and/or 970-819-9609 [cell] and at email: emily.waldron@state.co.us) 48 hours prior to workover rig mobilization/set-up.
OGLAForm: (04)
401308405
06/14/2017
Operator has been granted a Temporary Waiver for Greater Sage-Grouse Timing Restriction starting June 19, 20017 thru June 30, 2017 from CPW on June 12, 2017; to cinduct workover operations at this well pad location (OGCC ID# 333288). Correspondence has been attached to the Form 4 and location.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
WildlifeForm: (02A )
400391955
9/19/2013
1. Establish company guidelines to minimize wildlife mortality from vehicle collisions on roads. 2. Where oil and gas activities must occur within 4 miles of greater sage-grouse leks or within other mapped greater sage-grouse breeding or summer habitat, conduct these activities outside the period between March 1 and June 30. 3. Restrict post development well site visitations to portions of the day between 9:00 a.m. and 4:00 p.m. during the lekking season (March 1 to May 15).