| Planning | Form: (02A ) 400893568 11/6/2015 | This proposed oil and gas location is located in a rural rangeland area. The nearest building unit is located 1973’ away. |
| Storm Water/Erosion Control | Form: (02A ) 401455514 2/15/2018 | 604c.(2).G. Berm Construction: Kerr-McGee will create tertiary containment by construction of a berm or diversion dike, site grading, or other comparable measures sufficient to further protect the creek located 496' east of this proposed oil and gas location. |
| Material Handling and Spill Prevention | Form: (02A ) 401455514 2/15/2018 | 603.h.(1)B: Kerr-McGee maintains an Integrated Operations Center (IOC) in the Platteville office that is manned 24 hours a day by personnel who can monitor wells located in the floodplain and implement shut-in procedures if warranted. Kerr-McGee’s Denver office can also act as a backup Emergency Operations Center and assume shut-in responsibilities if required. |
| Material Handling and Spill Prevention | Form: (02A ) 401455514 2/15/2018 | 603.s.(A): Kerr-McGee maintains a current inventory of wells, tanks and separation equipment which can be made available if requested by the Director. This list includes a plan for remote shut-in of wells located within a defined floodplain, which will be made available to the Director upon request. All associated wells and equipment on this location will be added to this inventory and submitted to the Director in a timely manner. |