OGLA | Form: (02A ) 400454998 9/25/2013 | Operator must implement site-specific best management practices in accordance with good engineering practices, including, but not limited to, construction of a berm or diversion dike, site grading, or other comparable measures, sufficient to protect the irrigation ditches located 136 feet southeast and 230 feet west of the oil and gas location from a release of drilling, completion, produced fluids, and chemical products. |