| Planning | Form: (02A ) 400867823 11/20/2015 | This proposed oil and gas location is located in a rural rangeland area. The nearest building unit is located 1401’ away. |
| Construction | Form: (02A ) 400867823 11/20/2015 | KMG will install a temporary barricade around the water well on this location to protect it during construction and operations. |
| Community Outreach and Notification | Form: (04 ) 403469899 9/12/2023 | Courtesy notifications will be mailed to parcel owners within 2,000 ft. of the well pad and facility pad locations. The notification will include Kerr McGee contact information and the nature, timing, and expected duration of the operation. |
| Wildlife | Form: (04 ) 403469899 9/12/2023 | Working pad surface (WPS) is constructed so that any potential flows will flow to the northeast of the WPS, away from Western Box Elder Creek. The elevation on the pad and adjacent road that forms the border on 3 sides of this pad is relatively flat but slopes to the northeast. Chemical totes contain built in secondary containment and are made of steel. A compressor skid will be utilized temporarily at this location, which will be located on a trailer. The trailer will be placed inside secondary containment. The secondary containment is sufficient to hold the entire volume of all the chemicals on the compressor skid, plus substantial freeboard. The vegetation from the interim reclamation phase is very well established, which would also aid in preventing a release from reaching another drainage to the east of the WPS. |
| Noise mitigation | Form: (04 ) 403469899 9/12/2023 | A 12' sound wall will be utilized on the northeast corner of the well pad to mitigate sound for the nearby building unit. |