| PROPOSED BMPs | Form: (07 ) 0 1/23/2012 | Proposed BMPs
Williams Production RMT
RGU 11 -25 -198 Pad
Attachment to Form 2A
2A Attachment 10B
RECEIVED
OCT 0 5 2009
COGCC
Note: Williams is in the process of finalizing a Memorandum of
Understanding (MOU) with the CDOW and BLM which sets forth
commitments for the protection of wintering Mule Deer while year round drilling takes place within a concentrated area of northeast Ryan Gulch. Also associated with this MOU is a Wildlife Management Plan currently in preparation which will further guide activity in this part of the Ryan Gulch field. It is anticipated these documents will be in place by December 1, 2009.
|
| PROPOSED BMPs | Form: (07 ) 0 1/23/2012 | • Maintain undeveloped areas within development boundaries sufficient to allow wildlife to persist within development boundaries during all phases of construction, drilling, and production.
|
| PROPOSED BMPs | Form: (07 ) 0 1/23/2012 | • Treat waste water pits and any associated pit containing water that provides a medium for breeding mosquitoes with Bti (Bacillus thuringiensis v. israelensis) or take other effective action to control mosquito larvae that may spread West Nile Virus to wildlife, especially grouse.
|
| PROPOSED BMPs | Form: (07 ) 0 1/23/2012 | • Post speed limits and caution signs to the extent allowed by surface owners, Federal and state regulations, local government, and land use policies, as appropriate.
|
| PROPOSED BMPs | Form: (07 ) 0 1/23/2012 | • To the extent practicable, share and consolidate new corridors for pipeline rights - of - way and roads to minimize surface disturbance.
|
| PROPOSED BMPs | Form: (07 ) 0 1/23/2012 | • Use wildlife- appropriate fencing where acceptable to the surface owner.
|
| PROPOSED BMPs | Form: (07 ) 0 1/23/2012 | • Maximize the use of directional drilling to minimize habitat loss /fragmentation
|
| PROPOSED BMPs | Form: (07 ) 0 1/23/2012 | • Use remote monitoring of well production to the extent practicable.
|
| PROPOSED BMPs | Form: (07 ) 0 1/23/2012 | • Engineer new pipelines to reduce field fitting and reduce excessive right -of -way widths and reclamation.
|
| PROPOSED BMPs | Form: (07 ) 0 1/23/2012 | • Mow or brushhog vegetation where appropriate, leaving root structure intact, instead of scraping the surface, where allowed by the surface owner.
|
| PROPOSED BMPs | Form: (07 ) 0 1/23/2012 | • Phase and concentrate development activities, so that large areas of undisturbed habitat for wildlife remain.
|
| PROPOSED BMPs | Form: (07 ) 0 1/23/2012 | • Use wildlife appropriate seed mixes wherever allowed by surface owners and regulatory agencies.
|
| PROPOSED BMPs | Form: (07 ) 0 1/23/2012 | • Minimize rig mobilization and demobilization where practicable by completing or recompleting all wells from a given well pad before moving rigs to a new location.
|