Planning | Form: (02A ) 401060898 10/31/2016 | The nearest building unit is located 1872' away from this oil and gas location, therefore it is not within a Designated Setback Location and is exempt from 604.c. |
Storm Water/Erosion Control | Form: (02A ) 401060898 10/31/2016 | 604c.(2).G. Berm Construction: Kerr-McGee will create tertiary containment by construction of a berm or diversion dike, site grading, or other comparable measures sufficient to further protect the wetland located 129' of this proposed oil and gas location. |